Laserfiche WebLink
Be sure to check with your LIA <br /> vVV hat You Need to Know �oreyou s�upgrading. <br /> What is AutomaticPumpShutoff? <br /> What Is Eni'radinX? Do_1 Have to Upgrade My UST? By December 22, 19'98, all single-walled pressurized <br /> Upgrading means bringing an underground storage tank If you want to keep using your UST, you can either piping must be able to shut off automatically. That is, <br /> (UST)system, including piping,up to current regulatory upgrade it or replace it with a new one that meets the piping must be monitored by an automatic line <br /> standards Depending on how your system is equipped, California requirements. 'Whether you upgrade or replace leak detector that will shut off the pump so that <br /> it may mean installing any one or a combination of the -you're going to need a licensed contractor. dispensing cannot occur in the event of a leak or <br /> following: system failure. <br /> • interior lining What If I Don'C'Want the Tank Anymore? <br /> • cathodic protection Get permission from your LIA to close it (have it What is Cgthodic Protection'! <br /> + spill container It means protecting a tank system against corrosion. <br /> removed). Be sure to get a licensed contractor and follow <br /> ill <br /> prevention equipment closure requirements in Article 7 of California's USW Corrosion happens when bare metal and soil and <br /> • striker plates regulations. moisture combine to produce an electric current that <br /> • secondary containment for the tank and piping destroys hard metal. Over time, corrosion creates <br /> • automatic pump shutoff Why Should 1 Upgrade So Early? holes in tanks and then leaks occur. To protect against <br /> Which Tanks Need to Be Upgraded? <br /> Because if you wait: corrosion,you may do one of the following: <br /> • Single-walled steel tanks 0 Install cathodic protection for the tank and piping <br /> • All tanks that don't have spill and overfill prevention • Licensed contractors may be booked. Methods include an impressed current system or <br /> Supplies needed for upgrading may be scarce. a sacrificial anodes stem, and add interior lining <br /> • All single-wailed waste oil tanks <br /> and striker plates + Your LIA may be inundated with requests for to the tank, Y <br /> • Any tank not in compliance with California regula- upgrading or removal permits, making your request R <br /> tions take longer. + Replace with a double-walled tank and piping that <br /> • Your insurance company may not honor your policy if are already protected against corrosion. <br /> Which Piping Needs to Be Ungraded? your tanks are not in compliance by the deadline <br /> • An piping that does not have corrosion protection • Availability of State low cost loans for upgrading or Once II Upgrade With Interior Lining and <br /> Any p p g replacing tanks may decrease as the deadline nears. <br /> + Single-walled piping other than motor vehicle fuel p n& Y Cathodic Protection,Then What.. <br /> piping needs to be upgraded (replaced) with sec- • Cathodic protection systems must be inspected <br /> ondary containment. What is a.Snil1!Q9ntaiRrr? within 6 months of installation and every 3 years <br /> A container installed around the fill pipe to contain spills thereafter. Impressed current systems must also <br /> i Is the Deadline? during defiveries to the tank. be checked every 60 days. <br /> December 22, 1998. That's not the deadline for begin- • Cathodic protection systems must be checked <br /> ning the job-that's when it has to be finished. If it's not What is(]overfill Prevention Etluiument? within 6 months of any repair or modification to a <br /> finished,the tank goes out of service and the owner could Overfills happen when someone tries to put more product UST facility in which the modification may have <br /> face fines or criminal charges. The deadline will not be into a tank than it will hold. There are three main types of affected the cathodic protection system. <br /> extended by either the federal or state government. overfill protection: automatic shutoff devices, ball float + Interior lining must be inspected in 10 years and <br /> valves,and overfill alarms. every 5 years thereafter. <br /> Who Do I Have to Notify About Upgrading? <br /> You must notify your local implementing agency (LIA) r How Can I Get Financial H to Upgrade <br /> be ore you upgrade your UST system. In California, If you dont get started now... My Tank? <br /> LIM may be either city or county offices It is the same The California Trade and Commerce Agency, Office <br /> agency that issued your UST operating permit. If you're you may not be able to find a of Small Business, offers low interest loans to small <br /> unsure where your agency is, call your County Depart- businesses with USTs. Call the Office of Small <br /> meat of health or City Fire Department. contractor Business in Sacramento at(916)323-9879 for <br /> later! information on the"Repair/Replace Underground <br /> I'rintcci on recycled I'�I�r i Storage Tank Loan Program" (RUST)- <br /> . <br />