My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0087736_SSCR
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
11396
>
2600 - Land Use Program
>
SR0087736_SSCR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:52:09 PM
Creation date
5/1/2024 2:46:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSCR
RECORD_ID
SR0087736
PE
2603
STREET_NUMBER
11396
Direction
N
STREET_NAME
STATE ROUTE 99
City
LODI
Zip
95240
APN
05926010
ENTERED_DATE
2/20/2024 12:00:00 AM
SITE_LOCATION
11396 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
800
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y5MSdYz1 <br /> .SAN 0 6 1995 <br /> ENVIRONMENTAL HEALTH N MONTTORJNG PROCEDURES <br /> PERMIT011bGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be krpt at the LIST location. at all times. The information on this monitoring <br /> program are conditions of the operating permit The permit holder must notify San Joaquin County <br /> Environm atai Health Division.phone (209) 468-3420 within 30 days of any changes to the mcaitonng <br /> procedures, unicss required to obtaia approval before maldrg the change. <br /> Recpmk-ed by Sections 2632(d) and 2641(h) CCR.. <br /> Facility Name T & T Trucking, Inc. <br /> Facility Address 11396 N. Hwy 99 Lodi, California 95240 <br /> A. Describe the frequency of performing the monitoring: <br /> 'dank Daily stick reading and Dump totals <br /> Yearly tank to-sting <br /> Piping Lc. Y,�.k . <br /> B. What methods and zquipment, identified by name and model, will be used for <br /> performing the monitoring: <br /> Tank Computer pump tatals on Gasboy 2000 unit and stick <br /> readings <br /> Pipingr,c LLL <br /> C. Describe the Iccaticn(s) where the monitoring will be performed (facility plot plan <br /> should be attached): <br /> Underground diesel tank and underground gas tank (see <br /> attached -plot plan <br /> D. List the iiame(s) and ade(s) of the people responsible for performing the monitoring <br /> and/or maintaining die equipment: <br /> Monitoring - John Kin - Controller <br /> Maintaining - Terry Tarditi - President <br /> E. Reporting format tr monitoring: <br /> Tank Daily input andoutputspread sheet <br /> pipet <br /> F. Describe the preve,uve maintenance schedule for the monitoring equipment Note: <br /> Maintenance mtasz be in accordance with the manufacturers' maintenance schedule <br /> but not less than every Lmonths: Pumps are calibrated each year <br /> to ensure pump totals are accurate. <br /> G_ Describe the training necessary for the operation of UST system, including piping, <br /> and the monitoring =ipmem: N/A <br />
The URL can be used to link to this page
Your browser does not support the video tag.