Laserfiche WebLink
SAN JOAQUIN COUNTY HARDOUS MATERIALS MANAGEMENT PLAN Page 2 of 3 <br /> (Where employees are to report to) SECONDARY AREA N.E. OF WELDING SHOP. BOTH AREA <br /> PROMINENTLY MARKED. <br /> LOCATION OF HMMP FOR EMPLOYEE USE <br /> (10) MAIN SHOP, DRIVERS ROOM & OFFICE <br /> SURROUNDING OCCUPANCIES AND LAND USE SECTION (11) <br /> The following types of neighbors(e.g. residential, commercial, open space)are located within 1/8th mile of our facility. <br /> Names of hospitals, schools, and day-care centers within 1/8th mile of our facility are also shown.This information <br /> should be provided to the 9-1-1 operator at the time of the initial notification. <br /> NORTH RURAL/ RESIDENTIAL EAST RURAL/ RESIDENTIAL <br /> SOUTH RURAL/ RESIDENTIAL WEST RURAL/ RESIDENTIAL <br /> SPILL CONTROL PROCEDURES SECTION <br /> The following types of neighbors (e.g. residential, commercial, open space) are located within 1/8th <br /> mile of our facility. Names of hospitals, schools, and day-care centers within 1/8th mile of our facility <br /> are also shown. This information should be provided to the 9-1-1 operator at the time of the initial <br /> notification. <br /> SPILL CONTROL LEADER (12) TERRY TARDITI <br /> (also oversees inspections of areas or <br /> systems vulnerable to earthquakes) <br /> HE FOLLOWING INDIVIDUALS/POSITIONS ARE ASSIGNED TO HELP CONTROL A SPILL(13) <br /> TERRY TARDITI OWNER GEORGE WATSON SHOP FOREMAN <br /> AUTHORIZED SPILL CONTROL STRATEGIES(14) <br /> This business has authorized the above personnel to perform the action(s)indicated below to control spills of <br /> hazardous materials on its property. Persons performing these tasks will possess written procedures for performing <br /> hem and will have received training on the procedures and equipment needed prior to carrying them out. Locations of <br /> needed equipment are shown on the facility map.At a minimum our business must isolate the area of the spill and <br /> make notifications. <br /> SPILLS OF LIQUID MATERIALS <br /> Plug and Patch container ❑d Build Retention Dike <br /> Remove Sources of Ignition Position Container so as to Stop Leak <br /> Reduce Pressure in Container/System (] Isolate Area and Make Notifications <br /> a Neutralize Spilled Material Secure System Valves and Closures <br /> Shutdown System Involved Apply Absorbent Material to Spill Area <br /> ❑ N/A <br /> RELEASE OF COMPRESSED GASES SPILLS OF SOLID MATERIALS <br /> F Shut Off Valves/Systems Cover Spill to Prevent Spread <br /> IF Ventilate Area of Release Neutralize Spilled Materials <br /> Reduce Pressure in Container/System Position Container so as to Stop Leak <br /> Suppress Vapors with Water Place Spilled Material into Drum or Bag <br /> Isolate Area and Make Notifications 0 Isolate Area and Make Notifications <br /> Remove Sources of Ignition ❑ N/A <br /> ❑ N/A <br /> http://sjoesdata.org/oes hmmp/section tables/hmmp_ps review.lasso?-Database=transacti... 6/18/2010 <br />