My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
642
>
2300 - Underground Storage Tank Program
>
PR0231148
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2026 8:17:54 PM
Creation date
5/13/2024 11:02:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0231148
PE
2361 - UST FACILITY
FACILITY_ID
FA0000799
FACILITY_NAME
PARK ST PETROLEUM INC
STREET_NUMBER
642
Direction
N
STREET_NAME
HUNTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13906035
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
642 N HUNTER ST STOCKTON 95202
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br />Overfill Prevention Equipment Inspection Report <br />6. OVERFILL PREVENTION EQUIPMENT DETAILS <br />Tank ID (one OPE per column) <br />87 <br />87-5K <br />91 <br />DIESEL <br />Are both vent and tank riser piping <br />❑ Yes <br />❑ Yes <br />❑ Yes <br />❑ Yes <br />secondarily contained? <br />❑✓ No <br />❑✓ No <br />❑✓ No <br />❑✓ No <br />OPE Model <br />61 SO <br />61 SO <br />61 SO <br />61 SO <br />What is the OPE response when activated? <br />❑✓ Shut off <br />❑✓ Shut off <br />❑✓ Shut off <br />❑✓ Shut off <br />(Check all that apply.) <br />Flow <br />Flow <br />Flow <br />Flow <br />❑Restricts <br />❑Restricts <br />❑Restricts <br />❑Restricts <br />Flow <br />Flow <br />Flow <br />Flow <br />❑ Audible <br />❑ Audible <br />❑ Audible <br />❑ Audible <br />Alarm <br />Alarm <br />Alarm <br />Alarm <br />❑ Visual <br />❑ Visual <br />❑ Visual <br />❑ Visual <br />Alarm <br />Alarm <br />Alarm <br />Alarm <br />Are flow restrictors installed on vent piping <br />❑ Yes* <br />❑ Yes* <br />❑ Yes* <br />❑ Yes* <br />that may interfere with the OPE operation? <br />❑ No <br />❑ No <br />❑ No <br />❑ No <br />At what level in the tank is the OPE set to <br />84 <br />85 <br />84.5 <br />86.5 <br />activate? Inches from bottom of tank <br />What is the percent capacity of the tank at <br />93.2 <br />93.6 <br />93.6 <br />94.8 <br />which the OPE activates? <br />Is the OPE in proper operating condition to <br />❑✓ Yes <br />❑✓ Yes <br />❑✓ Yes <br />✓❑ Yes <br />respond when the stored substance <br />❑ No <br />❑ No <br />❑ No <br />❑ No <br />reaches the designated regulatory level? <br />7. SUMMARY OF TESTING RESULTS <br />ED Pass <br />❑✓ Pass <br />0Pass <br />❑✓ Pass <br />OPE Inspection Results <br />❑ Fail <br />❑ Fail <br />❑ Fail <br />❑ Fail <br />8. COMMENTS <br />Describe all results marked "Fail' and each proposed remedy. <br />* Mark here if: <br />❑ Flow restrictors interfere with overfill prevention and equipment repairs required. <br />Additional copies of this page may be attached. <br />Attach tank chart(s), measurements, calculations, and In -Tank Setup report(s) <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.