My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
CORRESPONDENCE_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2024 3:53:20 PM
Creation date
5/14/2024 9:57:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2022
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2-4 <br />Forward Composting Facility SWT Engineering <br /> Report of Composting Site Information - January 2022 <br /> <br />located along the eastern boundary of the site , just south of the entrance to the Composting <br />Facility/RRF. The locations of the wells located in the RRF/Compost Facility area are shown <br />on Figure 2. In addition, water is available from the s torm water runoff sedimentation <br />basins, however this alternative is not currently utilized at the site . For additional <br />information, refer to Section 3.5.2. <br />These water supplies are available for init ial mixing of the compost to bring the water <br />content up to desired levels, wetting of the compost, dust control, and other applications <br />through use of on-site water trucks. <br />Preprocessing. Preprocessing and initial handling of feedstocks is also common to t he <br />alternatives. Materials with large particle sizes such as wood waste, green material and <br />agricultural wastes may require grinding before use as feedstock and compost ing. All <br />incoming feedstock is spread out for manual screening before being stockpiled . These <br />materials will be handled in the manual sorting receiving area of the Compost Facility and <br />ground using a tub grinder. Additional grinding capacity will be added , as necessary, to <br />handle the volume of green and wood waste material received at the facility. Green <br />material high in grass will be mixed as soon as possible with ground wood waste and/or <br />recycled compost and/or other relatively dry and low C :N feedstock to minimize odor <br />production. Sorting of green and wood waste materials is done only as part of the <br />composting operation in an area near the grinder. <br />Any MSW that is mixed in with the curbside greenwaste is removed before composting. In <br />addition, removal of large objects is necessary to prevent damage to Windrow turning and <br />ASP equipment and grinding will aid decomposition during composting. If a higher quality <br />product is desired, more extensive pre-processing may be necessary. This could consist of <br />manual picking of metal, plastics and glass from the incoming material or receipt of clean <br />source-separated waste. <br />Grinding and trommel screening of the material prior to composting has significantly <br />improved the quality of the final compost product. More mechanized processing has <br />included magnetic and eddy current separation for improved re moval of iron and aluminum <br />components of the waste stream. The decision on the amount of preprocessing will be <br />determined by economics and the final use of the compost product. <br />Semi-solid materials such as food processing residue and food waste will be placed on other <br />materials such as ground green material or wood waste or recycled compost and mixed as <br />soon as possible to minimize the potential for leachate formation and odors. The amount of <br />these materials accepted will be limited by the availa bility of other feedstocks. <br />Current Design/Processing Option <br />Windrow Composting using a Windrow Turner. Figure 4 shows the layout for windrow <br />composting using a Windrow turner. A loader will be used to create the windrows, and a <br />windrow turner is used to turn t he windrows. The windrow dimensions can be up to <br />approximately 12 feet high and approximately 15 feet wide at the base. The space between <br />Windrows is about 8 feet to provide access for a water truck for water addition and for fire <br />control. Windrow composting using a windrow turner is also discussed in Section 1.3.1. <br />Windrow Curing and Screening . Following composting, the mixture may be screened or <br />placed in stock piles up to approximately 12 feet high and approximately 30 feet wide at the
The URL can be used to link to this page
Your browser does not support the video tag.