Laserfiche WebLink
FORWARD LANDFILL <br />RESOURCE & RECOVERY <br />2022-2023 WINTERIZATION PLAN <br />September 1022 <br />1. Grinding Pad & Sorting Pad <br />The pad has been graded such that the water flows to one of three onsite conveyances leading <br />directly to the lined impoundment on the west side of the Resource & Recovery (R & R) area. <br />2. Compost Pad <br />Composting activities are being performed on an approximately 20 -acre area. The composting <br />activities are limited to green waste materials. <br />3. Transfer Station <br />The transfer of recyclables is done within the twelve thousand square feet (12,000 sq) building <br />located on the eastern end and middle (North-South) of the R & R area. Rainwater from the roof <br />of the building is directed from the down spouts to the existing conveyances and then to the lined <br />impoundment. <br />4. Lined Impoundment <br />All water is held in the lined impoundment and then sampled and analyzed in accordance with <br />applicable Regional Water Quality Control Board (RWQCB) monitoring requirements. <br />5. Roads <br />All roads have been graded to provide a safe and stable surface for travel and to direct runoff to <br />the existing conveyances that route to the lined impoundment Roads will be cleared of mud as <br />needed to prevent tracking onto Austin Road. Forward has constructed a lire wash station along <br />the main exit road of the FRRF that is used to clean track tires. The tire wash station was <br />completed in July 2014. In addition, exit roads and Austin Road will be reviewed on an hourly <br />basis and will be cleaned by sweeper track and water truck, as needed, to prevent any build-up of <br />mud. <br />