My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_4/7/22 ASP RCSI APPENDICES
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
CORRESPONDENCE_4/7/22 ASP RCSI APPENDICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2024 9:15:14 AM
Creation date
5/14/2024 10:49:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
4/7/22 ASP RCSI APPENDICES
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
336
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Forward Compost Facility Stormwater Improvements <br />02771 4 GEOTEXTILES <br /> B. QA/QC CONSULTANT will reject rolls for which quality control requirements are not met. C. Certify the quality of the rolls of geotextile. D. Provide quality control certificates for each lot and each shift's production. The quality control certificates must include: 1. Roll numbers and identification. 2. Sampling procedures. 3. Results of quality control tests, including a description of test methods used. 2.4 LABELING A. Mark or tag geotextile rolls with the following information: 1. Manufacturer's name. 2. Product identification. 3. Lot number or date. 4. Roll number. 5. Roll dimensions. B. Mark special handling requirements on rolls. 2.5 DAMAGED GEOTEXTILE A. Geotextile damaged during transportation, loading, unloading, and delivery shall be documented by the QA/QC CONSULTANT. B. The GEOSYNTHETICS CONTRACTOR shall repair geotextile damaged before delivery to the satisfaction of the QA/QC CONSULTANT. If the geotextile can not be repaired to the satisfaction of the QA/QC CONSULTANT, the damaged geotextile shall be replaced by the GEOSYNTHETICS CONTRACTOR, at no cost to the OWNER. PART 3 EXECUTION 3.1 EXAMINATION A. Prior to installation of geotextile, examine underlying construction for conformance with specifications. 3.2 PROTECTION A. When placing soil materials over geotextile ensure the following: 1. No damage to geotextile. 2. No slippage of geotextile on underlying layers. 3. No excessive tensile stresses in the geotextile. B. Ensure that geotextiles are covered within 10 days of deployment.
The URL can be used to link to this page
Your browser does not support the video tag.