My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_4/7/22 ASP RCSI APPENDICES
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
CORRESPONDENCE_4/7/22 ASP RCSI APPENDICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2024 9:15:14 AM
Creation date
5/14/2024 10:49:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
4/7/22 ASP RCSI APPENDICES
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
336
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Page 8 <br />2.4.3 Documenting Non-Conformance <br /> <br />All non-conformance must be documented in writing on the daily records, logs, and elsewhere, as <br />appropriate. The documentation must occur immediately upon determining the extent of the non- <br />conformance. For those non-conformance which are considered serious or complex in nature, or <br />which require an engineering evaluation, a Non-conformance Report will be prepared and issued to <br />the Construction Manager and Contractor. <br /> <br />2.4.4 Corrective Measures <br /> <br />For a simple or routine non-conformance, corrective measures will be determined by specification <br />direction, or if none exists, the Construction Manager, QA/QC Manager and Contractor will discuss <br />standard construction methods to correct the deficiency. For Non-conformance Reports which <br />require an engineering evaluation, the Design Engineer must determine corrective measures. A copy <br />of the Non-conformance Report, with the Design Engineer's corrective measure determination, will <br />be forwarded to the Construction Manager, QA/QC Manager, and Contractor for implementation of <br />the corrective action. <br /> <br />2.4.5 Verification of Corrective Measures <br /> <br />Upon notification by the Contractor that a corrective measure is complete, the QA/QC Manager will <br />verify its completion. The verification must be accomplished by observations or retesting and <br />documented photographically. Written documentation of the corrective measures must be made by <br />the QA/QC Manager on daily reports, logs, and forms, and, if applicable, the Non-conformance <br />Report. Verification of corrective measure will be reviewed by the Construction Manager. <br />Corrective action measures that require an engineering evaluation will be reviewed and verified by <br />the Design Engineer. <br /> <br />2.5 Construction Monitoring <br /> <br />2.5.1 Monitoring Priorities <br /> <br />Before commencement of construction, the QA/QC Manager will establish a list of monitoring <br />priorities. The list includes the various construction activities and the monitoring priority of those <br />activities. The monitoring priorities may change during construction, based upon Contractor <br />performance and Owner request. Changes in the monitoring priorities must be approved by the <br />QA/QC Manager. <br /> <br />2.5.2 Discrepancies <br /> <br />All CQA testing must be conducted in accordance with this CQA Manual. If discrepancies exist <br />between the Specifications and the CQA Manual, the document that requires the most frequent tests <br />or has more stringent test requirements will govern, unless otherwise specified by the Design <br />Engineer. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.