My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_4/7/22 ASP RCSI APPENDICES
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
CORRESPONDENCE_4/7/22 ASP RCSI APPENDICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2024 9:15:14 AM
Creation date
5/14/2024 10:49:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
4/7/22 ASP RCSI APPENDICES
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
336
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Page 18 <br />levels and inclinometers, range poles and measuring tapes. <br /> <br /> Coordinate with the Earthwork Contractor and Owner to perform verification surveys at <br />the completion of earthfill operations. Verify corrective action measures as determined <br />by verification surveys. Verification surveys will also be used to determine the limits of <br />earthfills for measurement and payment applications. Submit copy of verification <br />surveys to the Construction Manager. <br /> <br /> <br />3.4.4 Subgrade Preparation <br /> <br /> <br /> Verify that grade control construction staking is performed prior to work. <br /> <br /> Verify that angular or sharp rocks, and other debris that could damage the geomembrane <br />are removed from the surface of the subgrade. Verify that the subgrade is free of <br />irregularities and is steel drum rolled smooth prior to geosynthetic placement. <br /> <br /> Verify that the final surface provides continuous and intimate contact with the overlying <br />geosynthetic. <br /> <br /> Coordinate with the Earthwork Contractor and Owner to perform subgrade verification <br />surveys upon completion of the subgrade preparation. Verify corrective action measures <br />as determined by the verification surveys. Verification surveys will also be used to <br />determine the limits of the subgrade preparation for measurement and payment <br />applications. Submit copy of verification surveys to the Construction Manager. <br /> <br />3.4.5 Granular Drainage Material <br /> <br /> Review the Contractor’s approved work plan of proposed methods to place granular <br />drainage material over geosynthetic installations. Determine and note corrective action <br />items if applicable. <br /> <br /> Perform soil tests to verify that the granular drainage material is in compliance with <br />material gradation and permeability requirements of the Specifications. Perform tests at <br />testing frequencies specified in Section 3.2.2. <br /> <br /> Monitor placement operations to verify that low ground pressure equipment is used in <br />accordance with the Specifications and that underlying geosynthetics installations are not <br />damaged during placement operations. Mark damaged geosynthetics and verify that <br />damage is repaired. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.