My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_4/7/22 ASP RCSI APPENDICES
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
CORRESPONDENCE_4/7/22 ASP RCSI APPENDICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2024 9:15:14 AM
Creation date
5/14/2024 10:49:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
4/7/22 ASP RCSI APPENDICES
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
336
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Page 20 <br /> <br /> <br /> <br />4 CONSTRUCTION QUALITY ASSURANCE <br />FOR GEOSYNTHETICS <br />4.1 General <br /> <br />The objectives of the geosynthetics CQA program are to: (i) assure that proper construction <br />techniques and procedures are used; and (ii) that the project is completed in accordance with the <br />Construction Drawings and Specifications. The intent of the CQA program is to: (i) to identify and <br />define problems that may occur during construction; and (ii) to verify that these problems are <br />corrected before construction is complete. <br /> <br />This section describes CQA procedures for the installation of geosynthetic components. The <br />following types of geosynthetics will be utilized for this project: <br /> <br /> Geotextile; <br /> <br /> 60-mil HDPE single-sided textured geomembrane; <br /> <br /> Geosynthetic Clay Liner <br /> <br />CQA for the geosynthetics installations will be performed to verify that geosynthetics are installed in <br />accordance with the design. Construction must be conducted in accordance with the Construction <br />Drawings and Specifications. To monitor compliance, the CQA program will (i) review the <br />Contractor's quality control submittals; (ii) perform material acceptance testing; (iii) monitor and <br />perform seam testing; and (iv) monitor installations. <br /> <br />Control testing will be performed by the material manufacturer. The manufacturer will submit a <br />quality control program prior to construction for the QA/QC Consultant to review and approve. The <br />manufacturer’s testing shall comply with the standards and frequencies as contained in the <br />Specifications. Acceptance criteria are defined in the Specifications. <br /> <br />All CQA testing will be conducted in accordance with this CQA manual and the Specifications. If a <br />discrepancy exists in the testing requirements, the document that requires the most stringent testing <br />will govern. <br />
The URL can be used to link to this page
Your browser does not support the video tag.