My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_4/7/22 ASP RCSI APPENDICES
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
CORRESPONDENCE_4/7/22 ASP RCSI APPENDICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2024 9:15:14 AM
Creation date
5/14/2024 10:49:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
4/7/22 ASP RCSI APPENDICES
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
336
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Page 32 <br />4.3.3 Geotextile Installation <br /> <br />Surface Preparation. Before geotextile installation, the QA/QC Inspector will: <br /> <br /> Verify that all lines and grades have been verified by the Contractor. <br /> Verify that all seaming and required testing of the HDPE geomembrane underlying the <br />cushion geotextile has been completed. <br /> <br /> <br />Geotextile Placement and Seaming. During geotextile placement and seaming operations, the <br />QA/QC Inspector will: <br /> <br /> Observe the geotextile as it is deployed and record all defects and defect corrective <br />actions (panel rejected, patch installed, etc.). Verify that corrective actions are performed <br />in accordance with the specifications. <br /> <br /> Verify that equipment used does not damage the geotextile by handling, equipment <br />transit, leakage of hydrocarbons, or other means. <br /> <br /> Verify that crews working on the geotextile do not smoke, wear shoes that could damage <br />the geotextile, or engage in activities that could damage the geotextile. <br /> <br /> Verify that adjacent panels are overlapped or seamed in accordance with the <br />Specifications. <br /> <br /> Verify that the geotextile was not exposed to direct sunlight for more than 5 days. <br /> <br /> Examine the geotextile after installation to ensure that no potentially harmful foreign <br />objects are present. <br /> <br />The QA/QC Inspector must inform both the QA/QC Manager and Earthwork Contractor if the above <br />conditions are not met. <br /> <br />4.3.4 Repairs <br /> <br />Repair procedures include: <br /> <br /> Patching--used to repair large holes, tears, and small defective areas. <br /> <br /> Removal--used to replace large defective areas where the preceding method is not <br />appropriate. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.