<br /> Page 34 <br /> <br />The QA/QC Manager will review all acceptance test results and report any non-conformance to the <br />Construction Manager and Contractor. <br /> <br />Sampling Procedures. Samples will be taken across the entire width of the roll. Unless otherwise <br />specified, samples will be 3 ft (1 m) long by the roll width. The QA/QC Consultant will mark the <br />machine direction on the samples with an arrow. <br /> <br />Test Results. The QA/QC Consultant will examine all results from laboratory acceptance testing and <br />will report any nonconformance to the Construction Manager. <br /> <br />Acceptance Test Failure. If a GCL acceptance sample does not comply with the minimum <br />requirements of the Specifications, the GCL roll from which the sample was taken will be failed by <br />the QA/QC Consultant, and replaced by the GCL Manufacturer at no additional cost to the Owner. <br />The Design Engineer shall be contacted to determine additional acceptance testing requirements. <br /> <br />4.4.3 GCL Installation <br /> <br />The Geosynthetics Contractor will handle all GCLs in such a manner as to ensure that they are not <br />damaged in any way, and will comply with the following. <br /> <br /> In the presence of wind, all GCLs will be sufficiently weighted with sandbags to prevent <br />their movement. Such sandbags will be installed during placement and will remain until <br />replaced with the overlying layer. <br /> GCLs will be cut using a utility knife in a manner approved by the QA/QC Inspector. <br />Care should be taken to prevent damage to any underlying liner system components <br />during cutting. <br /> During placement, care will be taken not to entrap stones, or moisture under the GCL. <br />Care will be taken not to drag equipment across the exposed GCL. <br /> Any GCL damaged by stones or other foreign objects, or installation activities will be <br />replaced at no additional cost to the Owner. <br /> The GCL will not be installed on a saturated subgrade or on standing water. The GCL <br />will be installed in a way that prevents hydration of the mat prior to completion of <br />construction of the liner system. <br /> The GCL will not be installed during precipitation or other conditions that may cause <br />hydration of the GCL.