My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_4/7/22 ASP RCSI APPENDICES
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
CORRESPONDENCE_4/7/22 ASP RCSI APPENDICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2024 9:15:14 AM
Creation date
5/14/2024 10:49:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
4/7/22 ASP RCSI APPENDICES
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
336
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Page 38 <br /> <br /> <br /> Number of Rows High <br /> Nominal Pipe Size (in.) For SDRs* 18 and <br />under <br /> for SDRs* over 18, up <br />to 26 <br /> for SDRs* over 26, up <br />to 32.5 <br />3 45 26 14 4 45 26 14 6 31 17 10 8 24 13 8 10 17 10 6 12 13 8 5 14 12 7 4 16 11 6 4 18 10 6 4 <br />*SDR=Standard Dimension <br />Ratio= <br /> <br />Pipe Diameter <br /> <br /> <br /> <br /> <br /> Min. Wall Thickness <br /> <br /> Verify that the pipe and tanks are not damaged by sharp rocks or excessive abrasion <br />when the pulled into place during fusion welding and installation operations. <br /> <br />5.2.2 Fusion Welding <br /> <br /> Before pipe fusion welding operations and installations verify that solid walled pipe, <br />perforated pipe, fittings, and flanged couplings comply with product requirements of the <br />technical specifications. <br /> <br /> Verify that certified fusion welding operators will be performing the welding. <br /> <br /> Verify that caution is taken to prevent water from coming in contact with the pipe and <br />heater plates during welding operations. A shelter may be required for the fusion <br />welding machine to allow operations to continue in adverse weather conditions. <br /> <br /> Verify that heater plate surface temperatures are maintained between 375°F and 400°F <br />for both coated plates and uncoated plates. Verify that operator checks heater plate <br />surface temperatures with pyrometer. <br /> <br /> Verify that inside and outside of pipe ends are cleaned to remove dirt, water, grease, and <br />other foreign material.
The URL can be used to link to this page
Your browser does not support the video tag.