My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_4/7/22 [REV] APPENDICES W/FIRE PERMIT
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
CORRESPONDENCE_4/7/22 [REV] APPENDICES W/FIRE PERMIT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2024 8:31:35 AM
Creation date
5/14/2024 10:57:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
4/7/22 [REV] APPENDICES W/FIRE PERMIT
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Forward Compost Facility Stormwater Improvements 02535 3 PIPES <br />PART 3 EXECUTION <br /> <br />3.1 GENERAL <br /> <br /> A. All polyethylene pipe shall be cut, fabricated, and installed in strict conformance <br />with pipe manufacturer's recommendations. Joining, laying, and pulling of <br />polyethylene pipe shall be accomplished by personnel experienced in working <br />with polyethylene pipe. <br /> <br /> B. Pipe shall be joined and placed in such a manner as to prevent damage to the <br />HDPE Geomembrane Lining and other underlying geosynthetics. <br /> <br /> <br />3.2 TRANSPORTATION <br /> <br /> A. Care shall be taken during transportation of the pipe such that it is not cut, kinked, <br />or otherwise damaged. <br /> <br />3.3 STORAGE <br /> <br /> A. Pipes shall be stored on level ground, preferably turf or sand, free of sharp objects <br />that could damage the pipe. Stacking of the polyethylene pipe shall be limited to a <br />height that will not cause excessive deformation of the bottom layers of pipes <br />under anticipated temperature conditions. Where necessary due to ground <br />conditions, the pipe shall be stored on wooden sleepers, spaced suitably and of <br />such widths as not to allow deformation of the pipe at the point of contact with the <br />sleeper or between supports. <br /> <br />3.4 HANDLING PIPE <br /> <br /> A. The handling of the joined pipeline shall be in such a manner that the pipe is not <br />damaged by dragging it over sharp and cutting objects. Ropes, fabric, or <br />rubber-protected slings and straps shall be used when handling pipes. Chains, <br />cables, or hooks inserted into the pipe ends shall not be used. Two slings spread <br />apart shall be used for lifting each length of pipe. Pipe or fittings shall not be <br />dropped onto rocky or unprepared ground. Slings for handling the pipeline shall <br />not be positioned at butt-fused joints. Sections of the pipes with cuts and gouges <br />exceeding 10 percent of the pipe wall thickness or kinked sections shall be <br />removed and the ends of the pipeline rejoined. <br /> <br />3.5 JOINING PIPE SECTIONS <br /> <br /> A. Pipes shall be joined to one another, to the polyethylene fittings, and to the flange <br />connections by means of thermal butt-fusion. Polyethylene pipe lengths, fittings, <br />and flanged connections to be joined by thermal butt-fusion shall be of the same <br />type, grade, and class of polyethylene compound and supplied from the same raw <br />material supplier. <br />
The URL can be used to link to this page
Your browser does not support the video tag.