My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_4/7/22 [REV] APPENDICES W/FIRE PERMIT
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
CORRESPONDENCE_4/7/22 [REV] APPENDICES W/FIRE PERMIT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2024 8:31:35 AM
Creation date
5/14/2024 10:57:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
4/7/22 [REV] APPENDICES W/FIRE PERMIT
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />FORWARD COMPOST FACILITY STORMWATER IMPROVEMENTS GEOSYNTHETC <br />02777 1 CLAY LINER <br /> <br />SECTION 02777 GEOSYNTHETIC CLAY LINER (GCL) PART 1 GENERAL <br />1.1 WORK INCLUDED <br />A. This section covers the Work necessary to furnish and install Geosynthetic Clay Liner (GCL), complete. B. The GEOSYNTHETICS CONTRACTOR shall furnish all labor, supervision, tools, equipment, and materials necessary to complete the GCL installation including, but not limited to, submittals, panel layout, seaming, temporary anchorage, and all necessary and incidental items required to complete the Work in accordance with these Specifications and the Construction Drawings. The EARTHWORK CONTRACTOR will excavate and backfill anchor trenches. The EARTHWORK CONTRACTOR will unload the GCL if the GEOSYNTHETICS CONTRACTOR is not onsite. <br /> C. The GEOSYNTHETICS CONTRACTOR shall be prepared to install the GCL sequentially with the subgrade preparation, geomembrane installation, placement of soil cover materials, and installation of the other components of the liner system. <br /> D. Prior to, during, and after installation, GCL shall not be allowed to hydrate and/or come in contact with water. <br />1.2 REFERENCES <br /> A. American Society for Testing and Materials [ASTM]: 1. ASTM D2216. Standard Method for Laboratory Determination of Water (Moisture) Content of Soil and Rock. 2. ASTM D5993 - Standard Test Method for Measuring Bentonite Mass Per Unit Area of Geosynthetic Clay Liners. 3. ASTM D4632 - Standard Test Method for Grab Breaking Load and Elongation of Geotextiles. 4. ASTM D5084 - Standard Test Method for Measurement of Hydraulic Conductivity of Saturated Porous Materials Using a Flexible Wall Permeameter. 5. ASTM D5321 – Standard Test Method for Determining the Coefficient of Soil and Geosynthetic or Geosynthetic and Geosynthetic Friction by the Direct Shear Method. <br />6. ASTM D5993 - Standard Test Method for Measuring Mass Per Unit of <br />Geosynthetic Clay Liners. <br />7. ASTM D6243 - Standard Test Method for Determining the Internal and <br />Interface Shear Resistance of Geosynthetic Clay Liner by the Direct Shear
The URL can be used to link to this page
Your browser does not support the video tag.