Laserfiche WebLink
Forward Compost Facility Stormwater Improvements <br />02778 8 HDPE GEOMEMBRANE <br /> <br />2.5 WELDING EQUIPMENT <br />A. Supply seam welding accessories meeting the following requirements: 1. Maintain sufficient operational seaming apparatus to continue work without delay. 2. Use power source capable of providing constant voltage under combined line load. 3. Provide protective lining and splash pad large enough to catch spilled fuel under electric generator, if located on liner. 4. Tensiometers capable of measuring seam strength, calibrated and accurate within 2 pounds. 5. Dies for cutting seam samples in first class condition. 2.6 MANUFACTURER SOURCE QUALITY CONTROL <br />A. Perform the following quality control tests at the manufacturing plant or other laboratories on geomembrane products: