My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_4/7/22 [REV] APPENDICES W/FIRE PERMIT
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
CORRESPONDENCE_4/7/22 [REV] APPENDICES W/FIRE PERMIT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2024 8:31:35 AM
Creation date
5/14/2024 10:57:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
4/7/22 [REV] APPENDICES W/FIRE PERMIT
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Forward Compost Facility Stormwater Improvements <br />02778 11 HDPE GEOMEMBRANE <br />3.3 INSTALLATION <br />A. Deployment. 1. Give careful consideration to the timing and temperature during deployment. The GEOSYNTHETICS CONTRACTOR shall verify that (a) there is no bridging or stresses in the geomembrane and (b) there are no wrinkles in the geomembrane that will fold over when covering with soil material. Ideally, deployment, welding, and covering should all occur at the same temperature. In a practical sense the GEOSYNTHETICS CONTRACTOR should strive to perform these activities within as narrow a temperature range as practical, and avoid these activities during peak hot or cold conditions. 2. Panel Identification: Assign each panel an identifying code number of letter consistent with the GEOSYNTHETICS CONTRACTOR's submitted panel layout drawing. The coding is subject to approval by the QA/QC CONSULTANT. 3. Daily Panel Deployment: Deploy no more panels in one shift than can be welded or secured during that same shift. 4. Do not deploy in the presence of excessive moisture, fog, dew, precipitation, ponded water, or high winds. 5. Do not damage geomembrane by handling, by trafficking, or leakage of hydrocarbons or any other means. 6. Do not wear damaging shoes or engage in activities that could damage the geomembrane. 7. Unroll geomembrane panels using methods that will not damage, stretch or crimp geomembrane. Protect underlying surface from damage. 8. Use methods that minimize wrinkles and differential wrinkles between adjacent panels. 9. Remove wrinkled or folded material. 10. Place ballast on geomembrane that prevents uplift from wind. 11. Use ballast that will not damage geomembrane. 12. Protect geomembrane in area of heavy traffic by placing protective cover which is compatible with and will not damage geomembrane. 13. Repair damage to subgrade or other underlying materials prior to completing deployment of geomembrane. 14. Do not allow any vehicular traffic directly on geomembrane. 15. Visually inspect geomembrane for imperfections. Mark faulty or suspect areas for repair. 16. Install material to account for shrinkage and contraction while avoiding wrinkles. Install material stress-free with no bridging before it is covered. Add material as needed to avoid bridging. 17. Before wrinkles fold over, attempt to push them out. For wrinkles that cannot be pushed out, cut them out and repair cuts prior to burial or at the direction of the QA/QC CONSULTANT. 18. Use slip sheet when deploying textured geomembrane over geotextiles to avoid damaging geotextile fibers. 19. Single-sided 60-mil textured HDPE geomembrane shall be installed in continuous contact with the underlying material and with the textured side facing down.
The URL can be used to link to this page
Your browser does not support the video tag.