My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_4/7/22 [REV] APPENDICES W/FIRE PERMIT
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
CORRESPONDENCE_4/7/22 [REV] APPENDICES W/FIRE PERMIT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2024 8:31:35 AM
Creation date
5/14/2024 10:57:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
4/7/22 [REV] APPENDICES W/FIRE PERMIT
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Forward Compost Facility Stormwater Improvements <br />02778 14 HDPE GEOMEMBRANE <br />5. Do not remove more than 4 mils of material when grinding. 6. Grind across, not parallel to, welds. 7. Cover entire width of grind area with extrudate. 8. When restarting welding, grind ends of all welds that are more than 5-minutes old. <br />H. Hot Wedge Welding. 1. Place smooth insulating plate or fabric beneath hot welding apparatus after usage. 2. Protect against moisture build-up between panels. 3. If welding cross seams, conduct field test welds at least every 2 hours, otherwise, once prior to start of work and once at mid-day. 4. Bevel edges of top and bottom panels on cross seams. 5. Do not weld on geomembrane until equipment has passed trial weld test. 6. Extrusion-weld a repair patch over all seam intersections. 3.4 FIELD QUALITY CONTROL AND QUALITY ASSURANCE <br />A. General: Manufacturer, Fabricator, and GEOSYNTHETICS CONTRACTOR shall participate in and conform with all terms and requirements of the OWNER's construction quality assurance program. The GEOSYNTHETICS CONTRACTOR is responsible for assuring this participation. Construction quality control and quality assurance requirements are as specified in this paragraph and the CQA Manual. <br />B. Acceptance Testing 1. Allow 4 days for acceptance testing following the date material is available to the QA/QC CONSULTANT. 2. Perform acceptance testing on geomembrane rolls. 3. The QA/QC CONSULTANT will obtain and test samples. 4. Test samples for conformance with design specifications and guaranteed properties. 5. Perform, as a minimum, following tests to determine geomembrane characteristics. a. Density: ASTM D792, Method A or ASTM D1505. b. Thickness: Measured with appropriate micrometer where applicable. Take 20 measurements across the roll width. c. Tensile Strength: ASTM D638. d. Carbon Black Content: ASTM D1603. e. Carbon Black Dispersion: ASTM D3015 f. Asperity: GM-12. 6. Interface Direct Shear Strength: ASTM D5321. The QA/QC CONSULTANT will collect samples of gemembrane for interface direct shear strength testing. The QA/QC CONSULTANT shall perform one interface shear test between the clay liner and textured geomembrane and one interface shear test between the textured geomembrane and the cushion geotextile, as discussed in Section 2.3. 7. Sampling Procedures. a. Sample across the entire width of the roll. b. Cut sample 3-feet-long by width of roll.
The URL can be used to link to this page
Your browser does not support the video tag.