My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_4/7/22 [REV] APPENDICES W/FIRE PERMIT
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
CORRESPONDENCE_4/7/22 [REV] APPENDICES W/FIRE PERMIT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2024 8:31:35 AM
Creation date
5/14/2024 10:57:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
4/7/22 [REV] APPENDICES W/FIRE PERMIT
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Forward Compost Facility Stormwater Improvements <br />02778 16 HDPE GEOMEMBRANE <br />tunnel created by the weld. iii. Energize the air pump to a minimum pressure of 30 psi or 1/2 psi per mil of liner thickness, whichever is greater, close valve and sustain pressure for at least 5 minutes. iv. If loss of pressure exceeds 2 psi (10 mm mercury), or otherwise approved, or does not stabilize, locate faulty area and repair in accordance with repair procedures described in this specification. v. Puncture opposite end of seam to release air. If blockage is present, locate and test seam on both sides of blockage. vi. Remove needle or other approved pressure feed device and seal the penetration holes. 4. Spark Testing for penetrations or other difficult areas not accessible for vacuum testing. a. Equipment and Materials. i. 24 gauge copper wire. ii. Low-amperage electric detector, 20,000 to 30,000 volt, with brush-type electrode capable of causing visible arc up to inch from copper wire. b. Procedures. i. Place copper wire within inch of the edge of extrusion seam or clamp seal. ii. Pass electrode over seam or clamp area and observe for spark. If a spark is detected perform a repair. 5. Destructive Testing. a. Location and Frequency of Testing. i. The QA/QC CONSULTANT shall collect destructive test samples at a minimum frequency of one test location per 500 feet of seam length. ii. Determine test locations during welding. Locations may be prompted by suspicion or excess crystallinity, contamination, offset welds, or suspected defect. The QA/QC CONSULTANT will be responsible for choosing the locations and will not notify installer in advance of selecting locations where weld samples will be taken. iii. The QA/QC CONSULTANT may increase the test frequency based on marginal results. b. Sampling Procedures. i. The GEOSYNTHETICS CONTRACTOR shall cut samples at locations designated by the QA/QC CONSULTANT as the welding progresses. Verify that laboratory test results have been obtained before the geomembrane is covered by another material. ii. The QA/QC CONSULTANT will number each sample and mark sample number and location in compliance with the CQA program. iii. The GEOSYNTHETICS CONTRACTOR shall immediately repair all holes in the geomembrane resulting from destructive test sampling. Repair in accordance with repair procedures
The URL can be used to link to this page
Your browser does not support the video tag.