My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_4/7/22 [REV] APPENDICES W/FIRE PERMIT
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
CORRESPONDENCE_4/7/22 [REV] APPENDICES W/FIRE PERMIT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2024 8:31:35 AM
Creation date
5/14/2024 10:57:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
4/7/22 [REV] APPENDICES W/FIRE PERMIT
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Forward Compost Facility Stormwater Improvements <br />02778 19 HDPE GEOMEMBRANE <br />5. Removing the seam and replacing with a strip of new material. <br />D. In addition, satisfy the following procedures: 1. Abrade geomembrane surfaces to be repaired (extrusion welds only) no more than one (1) hour prior to the repair. 2. Clean and dry all surfaces at the time of repair. 3. The repair procedures, materials, and techniques must be accepted in advance of the specific repair by the QA/QC CONSULTANT and the GEOSYNTHETICS CONTRACTOR. 4. Extend patches or caps at least 6 inches beyond the edge of the defect, and round all corners of material to be patched and the patches to a radius of at least 3 inches. 5. Unless otherwise instructed by the OWNER, cut geomembrane below large caps to avoid water or gas collection between the sheets. <br />E. Verification of repair: 1. Number and log each repair. 2. Non-destructively test each repair using methods specified in Article 3.4 of this Section. 3. Destructive tests may be required at the discretion of the QA/QC CONSULTANT. 4. Reconstruct repairs until tests indicate passing results. 3.6 GEOMEMBRANE ACCEPTANCE <br />A. The GEOSYNTHETICS CONTRACTOR retains all ownership and responsibility for the geomembrane until acceptance by the OWNER. <br />B. OWNER will accept geomembrane installation when: 1. All required documentation from the manufacturer, fabricator, and installer has been received and accepted. 2. The installation is finished. 3. Test reports verifying completion of all field seams and repairs, including associated testing, is in accord with the Section. 4. Written certification documents and drawings have been received by the QA/QC CONSULTANT and the OWNER. PART 4 MEASUREMENT AND PAYMENT (Refer to Section 01200, MEASUREMENT AND PAYMENT PROCEDURES) <br /> END SECTION
The URL can be used to link to this page
Your browser does not support the video tag.