Laserfiche WebLink
COMMUNITY DEVELUr MENT DEPARTMENT <br /> SANJOAQUINADMINISTRATIVE / CONDITIONAL USE PERMIT <br /> Y ----- <br /> FILE NUMBER : <br /> PERFORMANCE STANDARDS <br /> (Attach additional sheets as necessary) <br /> See Chapter 9= 1025 of the Development Title for Performance Standard Regulations <br /> Air Quality <br /> remissions <br /> llutants that may result from the project including during construction : <br /> d result in ozone precursor emissions ( reactive organic gases [ ROG] and nitrogen oxides [ NOX] ) and particulate <br /> (fugitive dust and diesel engine exhaust ) from the use of heavy construction equipment and on - road vehicles ; <br /> om painting and use of asphalt; and greenhouse gases ( GHG ) emissions from equipment and vehicle use . <br /> Noise <br /> FDescri.ben -site sources of noise or vibration that may result from the proposed project : <br /> would result in temporary noise from the use of heavy constructions equipment , and temporary increases in traffic noise ; . <br /> and temporary vibration from vibratory rollers . Operational noise sources would include building mechanical systems , emergency <br /> backup generators , landscape maintenance equipment , outdoor patient/resident recreational activities , parking lot noise , and traffic noise . <br /> Describe any machinery , equipment , or transportation noise that may result from the proposed project : <br /> Building mechanical system and backup generator noise would depend on the equipment types and locations , unknown at this time . <br /> Transportation noise would be from worker and patient vehicle trips , and truck noise from deliveries to the site and waste removal . <br /> Light and Glare <br /> Describe any on -site sources of light and /or glare that may result from the proposed project . <br /> All outdoor luminaires of 6 , 200 initial luminaire lumens or greater will comply with Backlight , Uplight and Glare ( BUG ) ratings as defined in California Energy Code <br /> The proposed project materials would not create any additional glare to the adjacent highway or surrounding properties . <br /> Odor <br /> Describe any on -site source of odor that may result from the proposed project : <br /> The project includes community gardens . The use of fertilizers and/or compost could be a minor source of odors . <br /> Page 5 of 6 <br /> 03/ 28/ 2023 <br />