Laserfiche WebLink
Location:CGRS Project No : <br />Test Date: <br />CGRS Techs: <br />IOTA Tech Signature: <br />Sergio L. Nunez CA Tank Tester #06-1727 <br />Reviewed by: <br />Chris Murphy Director of CA Services <br />Secondary Flow Communication Test Certification <br />61-28625 <br />Chevron #210097 July 16, 2024 <br />1442 W Colony Rd Sergio L. Nunez <br />Ripon, CA 95366 <br />COMPONENTS RESULTS <br />Piping Secondary Communication Confirmation <br />DSL PL PASS <br />7/16/2024 <br />DSL Vent PASS <br />7/19/2024 <br />Date <br />Date <br />CGRS certifies that at the time the final ELD testing was performed, air flow communication was confirmed <br />throughout the secondary piping components listed below.