My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
15688
>
3600 - Recreational Health Program
>
PR0527635
>
COMPLIANCE INFO_PRE 2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2024 4:01:31 PM
Creation date
5/28/2024 2:34:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3600 - Recreational Health Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2024
RECORD_ID
PR0527635
PE
3611
FACILITY_ID
FA0018725
FACILITY_NAME
HOLIDAY INN
STREET_NUMBER
15688
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19620077
CURRENT_STATUS
01
SITE_LOCATION
15688 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
From:SKELTON HEATING & P 2098322785 05/r '2007 09:21 #015 P.002/005 <br /> Poo! Load Worksheet <br /> DESEQT 5/4/2007 <br /> AAME <br /> 02001 Arnedwri Society of Heating and Air-conditioning Engineers,Inc.(www.ashrae.one Weather Data used by permission Rev 200702B <br /> AIR TREATMENT CORP.-SF(Alameda) <br /> 2156 Central Avenue <br /> Alameda, CA 94501 _ <br /> Ph: (510)769-0700 Design Outdoor Conditions <br /> Fax: (510)769-0702 State: — ' <br /> City: <br /> ProjeCt: Best Westem,Lathrup Weather Data lsftam ASHRAE Dehumidification DBJMDP-Table lB <br /> Tag: DH-, <br /> �A5�tAEU.4N. �A'slr?la>=a:k°' +3 <br /> Fool Roam Design Details <br /> 325 sq ft --, Outdoor Air Conditions <br /> Water Tem p.lstPool: 85 OF OASHRAE Weather Data •User-EniteredData <br /> p 86 sq ft 1T_ er ¢ tl <br /> Water <br /> naT��e=m 2nd Pool: 102 -F Summer 90`Fdb <br /> cf tp 0 Sq ft Summer 76'FV& <br /> Water temp.3rd Pool: 0 F 114 gr/Ib <br /> Pool Room Volume: 15,750 cu ft -`-�teating 1'Fdb <br /> 30 ft. <br /> Outside Air Design Details <br /> r Power Source <br /> Pool&Deck Area: 1,339 Sq tt I 060 Hz 050 Hz <br /> Spectator/Bleacher Area 0 sq ft <br /> Number of Spectators: 0 Outdoor Condenser Design Temperature:95'F <br /> Design Pod&Deck 350 efm Select Dehumidifier <br /> Design Spectator. 0 cfm t ; Model: LC05 <br /> Design Ventilation Air CFM Within_5jillected Unit Capacityu <br /> Outside Air Is Providing 1.3 A/C per hour ROC Model Type: Standard Une Single Phase <br /> Me Outside Air Pre-heat Re uirned UnOcc Occ <br /> Indoor Air Design Details -� Unit Moisture Capacity: 33.6 33.6 Ib/hr <br /> Enter Unit Quantity: 1 1 <br /> Room Design Temp. 80 OF Total Moisture Capacity: 33.6 33.6 Ib/hr <br /> RH Design Unoccupied 65 % <br /> RH Design Occupied 65 % Room Air Changes: 8.8 A/C per hour <br /> Unoccupied Pool Evaporation Calculation <br /> _._. - <br /> 1st Pool: 8.81b/hr <br /> 2nd Pool: 5.9 Ib/hr Total Capacity 71.8 MBH <br /> 3rd Pool: 0.0 Ib/hr Sensible Capacity 36.2 MBH <br /> Pool&Deck Outside Air: 0.0 Ib/hr Net Reheat Capacity 58.9 MBH <br /> Spectator Outside Air. 0.0 Ib/hr Unit Air Volume 2;300 CFM <br /> Total @ 65%RH 14.8 Ib/hr LAT in Reheat 103.1 -F <br /> LAT in Cooling 67.5 T <br /> Occupied Pool Evaporation Calculation Power 6.5 kW <br /> Max Ou(side Air 900 CFM <br /> 1St Pool: 8.8 Ib/hr THR/Water Htg Capacity 89.9 MBH <br /> 2nd Pool: 11.9 Ib/hr Remote Condenser Model ROCF2-9S01C <br /> 3rd Pool: 0.0 Ib/hr <br /> Pool&Deck Outside Air. 2.9 Ib/hr <br /> Spectator Outside Air. 0.0 Ib/hr <br /> Spectator Latent: 0.0 Ib/hr <br /> Total @ 65%RH 23.6 Ib/hr <br /> The above equipment selection is based on project information provided by others(e.g.pool water and air temperatures).Any changes may require different dehumidification capacity than the unit <br /> suggested above can provide.The above sizing is based on the dehumidifira0on load only.The building sensible cooling load is not calculated above. The engineer or contractor of record is <br /> responsible for the actual cooling load at the stated space air temperature above. <br /> ;P,fll <br /> 6� <br /> PDF created with pdfFactory trial version www.pdffactory.comar0` <br />
The URL can be used to link to this page
Your browser does not support the video tag.