Laserfiche WebLink
OPERATIONAL TIME TIME <br />DATE STATUS OFFLINE ONLINE <br />November 8, 2023 ON-LINE <br />November 25, 2023 ON-LINE <br />November 25, 2023 OFFLINE <br />December 1, 2023 OFFLINE <br />December 8, 2023 ON-LINE 12:00 <br />December 12, 2023 ON-LINE <br />December 13, 2023 OFFLINE 15:00 <br />December 14, 2023 OFFLINE <br />December 16, 2023 ON-LINE <br />December 17, 2023 ON-LINE <br />December 28, 2023 ON-LINE <br />NOTES : <br />PUMPING <br />EXTRACTION WELL 5 1 WELL RUNNING <br />EXTRACTION WELLS 1, 2, 3R, 4 & 5 5 WELLS RUNNING <br />DEL-TECH GEOTECHNICAL SUPPORT SERVICES, INC. <br />(209) 232-7967 (OFFICE) * cassandra@deltech1.com (Email) <br />SITE: FORWARD LANDFILL / MANTECA, CA. <br />GROUNDWATER TREATMENT SYSTEM MONITORING LOG 2023 <br />DOWNTIME LOG <br />SYSTEM <br />NAME ACTIONS / REASON FOR DOWNTIME <br />EXTRACTION WELLS 1, 2, 3R, 4 & 5 5 WELLS RUNNING <br />EXTRACTION WELLS 1, 2, 3R, 4 & 5 5 WELLS RUNNING <br />EXTRACTION WELLS 1, 2, 3R, 4 & 5 <br />EXTRACTION WELLS WERE TURNED OFF IN <br />PREPARATION FOR CONVEYANCE LINE CLEANING <br />NEXT WEEK. <br />EXTRACTION WELLS 1, 2, 3R, 4 & 5 <br />ATTEMPTED TO TURN SYSTEM BACK ON, HOWEVER, <br />DUE TO INCREASING INFLUENT PRESSURE WE COULD <br />NOT LEAVE THE SYSTEM ON. FURTHER <br />TROUBLESHOOTING IS SCHEDULED. <br />EXTRACTION WELL 5 1 WELL RUNNING <br />EXTRACTION WELL 5 <br />EXTRACTION WELL 5 WAS TURNED OFF IN <br />PREPARATION FOR CARBON CHANGEOUT. <br />EXTRACTION WELLS 1, 2, 3R, 4 & 5 <br />CARBON CHANGEOUT ON UNIT 1 WAS COMPLETED. <br />GAC UNIT 2 IS NOW LEAD AND GAC 1 IS NOW LAG. <br />SYSTEM WAS TURNED ON FOR A SHORT TIME TO FILL <br />UP UNIT 1 AND ALLOW CARBON TO SOAK. <br />EXTRACTION WELLS 2, 3R, & 5 3 WELLS RUNNING <br />EXTRACTION WELLS 1, 2, 3R, 4 & 5 5 WELLS RUNNING