Laserfiche WebLink
Mr. Brendan Kenny <br />October 13, 2022 <br />Page 3 <br />The instantaneous total flow rate of LFG on September 19, 2022, was 1,443 standard cubic feet per <br />minute (scfm) at the LFG-to-energy (LFGTE) facility, 979 scfm at Flare A-1, and 1,640 scfm at Flare A- <br />2. <br />CONCLUSION <br />To the best of our knowledge, monitoring, testing, and inspection of the GCCS performed during the <br />third quarter of 2022 satisfies the requirements of the Order as it applies to the operation and <br />maintenance of the GCCS at the Landfill. <br />Please feel free to contact Maura Dougherty at 669-290-2585 if you have any questions or wish to <br />discuss this report. <br />Sincerely, <br />Lauren P. Nelson, P.E. Maura E. Dougherty, P.E. <br />Project Professional Senior Project Manager <br />SCS Engineers SCS Engineers <br />Enclosures: <br />Table 1- Third Quarter 2022 Probe Monitoring Results <br />Table 2- Third Quarter 2022 GCCS Wellfield Monitoring Data