Laserfiche WebLink
Underground Storage Tank <br />Monitoring System Certification Form <br />10. MONITORING SITE PLAN <br />Date site plan was prepared: <br />If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br />with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br />identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br />a legend for all symbols depicted. <br />Site Address: VAN DE POL 351 N. BECKMAN ROAD LODI CA 95240 <br />KET HIG]iR:aY99 N --► <br />A= AnULAR *PIPLIG * <br />F=FILLS (ARROWS) ITLS 150 <br />T = TUPRBLYE D=ingw of 0❑ `� J <br />P = PROBE piping cit of <br />V = VAPOR sump and UDC's. CAS <br />X= SUJIP SENSOR No tnrdersround /+� <br />L=Leak Detector drauivais 0Vo 0 <br />M=R angivit accurate,tve VFNTC <br />B=Brine Sensor cannot speculate NTNT t>P <br />I = Stuart Sensor blue pr <br />S =STP <br />= Floats & c1saim. <br />E=E Stop <br />JT6666.. , 6666. _6666. 6666.. 6666. <br />OIL <br />. 6666. 6666 � <br />. G I It= . X L I <br />a6.41...0 0 1 1 1 1(� <br />2 _ L X L M <br />- .' <br />X Q <br />N L 9� <br />X � <br />L X <br />X , <br />L X . <br />6666.. 6666_... P V 6666 6666_ <br />66-66.. .. •.�3_. ..�_.�. X V 6666 ............. <br />.g.� VI I r I I I I . <br />...1 .351 N. BECKMAN ROAD <br />10_ 1616 1 1 1 r 1 1 4 P .. 4.. .. 1 1 1 q I I I I I I. <br />dtgt• items widarground that we nor visible to the cert((ift techticimt ora a <br />prq{utiouatopnionmi& mid aresofe(vforirtforntatiaurlpmposss Dratring <br />nor to scale <br />Date map was drawn; 6464 <br />9 <br />Instructions <br />If you already have a diagram that shows an required information, you may include_ it rather than this page, with your Monitoring System Certification. On your site plan, <br />=_haw the genera! layout of tanks and piping. Clearly identify locations ofthe following equipment, d Installedmonitoring system control panels; sensors momlorng tank <br />annular spaces, sumps, dispenser pans, spill containers, or other seco. Bary containment areas; mechanical or electronic line leak detectors; and Ingank liquid level <br />probes (I used for leak detecten). In the space provided, note the date this Site Plan was prepared. <br />Monitoring System Cert <br />ification <br />Page d of d <br />21,214:07 <br />Page 6 of 6 <br />