Laserfiche WebLink
SECTIONFOUR site Hazard ANOWS13 <br /> Safety Equipment Checklist <br /> Quantities of individual equipment are dependent on individual field assignment, individual field <br /> requirements,usage rate,number of assigned personnel, and other contributing factors. The following <br /> safety equipment should be readily available at the site during field activities. SSO shall pre-assess <br /> individual field assignments and determine site safety equipment requirements. The PPE requirements for <br /> each task are specified in the JSAs in Attachment D. <br /> Personal Protective Equipment(per person) Monitoring Equipment <br /> O Air-Purifying respirator(full-and/or half-face) X Oxygen level/CGI <br /> O Cartridges(Organic vapor/HEPA,or as indicated: PID(10.6 eV lamp) <br /> X Safety steel toe boots X Toxic gas monitor(e.g.,HZS,CO) <br /> Coveralls(Tyvek) X Lower Explosivity Meter(LEL) <br /> X Hard hat <br /> X Nitrile gloves(22 mil., 15 mil., 11 mil) Decontamination Equipment <br /> X Safety glasses/goggles <br /> O Ear plugs Tub <br /> Ear muffs X DI water . <br /> X Safety vest Garbage can w/liner <br /> Misc.PPE/First Aid and Emergency Equipment Buckets(10 gallons) <br /> X Potable water(emergency rinse and eyewash) X Plastic garbage bags <br /> X First aid kit 55-gallon drums <br /> X Drinking water Brushes <br /> X Fire extinguisher(10/20 pound UL Rating ABC) Hand pressurized portable water sprayer <br /> Portable air horn X Detergent(Liquinoxg') <br /> X Cellular phone X Paper towels <br /> X HI-VIS safety vests Table <br /> X Site control equipment:fencing(surrounding work Benches <br /> site),cones,barricade tape,placards,signs,etc.) <br /> TS AND SETTINGS\CLEIMBECH\DESKTOP\WORLD ENTERPRISES\WORK PLANS\WELL DESTRUCTIONWTTACHMENT C WORLD ENTERPRISES HSP TG EDITS.DOC\16- <br />