Laserfiche WebLink
URS <br /> Mr. Robert McClellon <br /> April 29,2011 <br /> Page 2 <br /> monitoring wells were installed at the site on June 12, 2006. Following the installation of the <br /> groundwater monitoring wells, groundwater samples were collected quarterly and analyzed for VOCs. <br /> Mr. Ross Atkinson of the Regional Water Quality Control Board (RWQCB)Central Valley Region <br /> requested that groundwater samples be collected and analyzed for metals and general minerals (only total <br /> dissolved solids [TDS] after the first event) starting in 4Q06. In a meeting on May 24, 2007, <br /> Mr. Atkinson concurred with the recommendation in the Quarterly Monitoring Report dated <br /> April 30, 2007,to suspend the groundwater monitoring activities for VOCs. <br /> FIELD ACTIVITIES <br /> Landfill gas concentrations were measured within the gas migration monitoring probes,extraction wells, <br /> and passive vents, and quarterly groundwater monitoring activities were completed on March 15, 2011. <br /> Using a handheld portable landfill gas monitor, a GEM 2000, each gas-migration monitoring probe, each <br /> extraction well, and each passive vent was measured for methane, oxygen, and carbon dioxide. These <br /> measurements were recorded in a field logbook. <br /> Groundwater samples were collected from the three monitoring wells using the following procedures: <br /> • The water level within each monitoring well was measured using an electronic water level sounder. <br /> • Prior to groundwater sample collection, each well was purged using a bailer. During purging, <br /> groundwater parameters(pH,temperature, and conductivity)were recorded on the Monitoring Well <br /> Sampling Data form (Attachment 1)at least once per well casing volume. Purging was completed <br /> when the groundwater parameters had stabilized to within 10% or the monitoring well was bailed <br /> dry. The purged water was placed in a 55-gallon drum, pending disposal. <br /> • A groundwater sample, collected from each well using a bailer, was placed into the analytical <br /> laboratory-prepared sample containers. <br /> • Groundwater samples were labeled and placed in an ice chest with ice. The ice chest was shipped to <br /> EMAX Laboratories, Inc. in Torrance,California, under proper chain-of-custody procedures for <br /> selected dissolved metals analyses by United States Environmental Protection Agency (EPA) <br /> Methods 6010/6020/7470 and TDS analysis by EPA Method 160.1. <br /> RESULTS <br /> Soil Vapor. The methane concentrations measured during the quarter in the gas-migration monitoring <br /> probes were 0.1% in VW-3, 0.1% in VW-6D, 0.1% in VW-7S, 0.1% in VW-7D, 0.1% in VW-8D, and <br /> 0.1% in VW-9. The methane concentration measured in the remaining probes(VW-1, VW-2, VW-4, <br /> VW-5S, VW-513, VW-6S, VW-8S and VW-10)was zero percent. Methane concentrations measured in <br /> the vapor extraction wells were 7.3% in EW-1 and 0.1% in EW-2. Methane concentrations measured in <br /> the passive vents were 0.7% in VP-1, 3.1% in VP-2, 6.5% in VP-3, and 6.7% in VP-4. Oxygen <br /> concentrations measured at all sample locations during the quarter ranged from 0.6%to 20.4 percent. <br /> Carbon dioxide concentrations measured at all sample locations during the quarter ranged from 0.1%to <br /> H\Wprocess\25532\WorldEnterprise\Quarterly Rpt\2011\1Ql 1\043011 doc <br />