My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2011-2016
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNPIKE
>
3504
>
4400 - Solid Waste Program
>
PR0515730
>
CORRESPONDENCE_2011-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2024 3:25:22 PM
Creation date
6/27/2024 2:28:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2011-2016
RECORD_ID
PR0515730
PE
4430 - SOLID WASTE CIA SITE
FACILITY_ID
FA0012310
FACILITY_NAME
WORLD ENTERPRISES
STREET_NUMBER
3504
Direction
S
STREET_NAME
TURNPIKE
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
17517018
CURRENT_STATUS
Active, billable
SITE_LOCATION
S TURNPIKE RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
3504 S TURNPIKE RD STOCKTON 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Section 1 ONE Project Information...............................................................................1-1 <br /> 1.1 Project Identification and Approvals....................................................... 1-1 <br /> 1.2 Applicability............................................................................................ 1-2 <br /> 1.3 Site Location and Description.................................................................. 1-2 <br /> 1.4 Scope of Work......................................................................................... 1-3 <br /> 2. Section 2 TWO Behavior Based Safety Program.........................................................2-1 <br /> 2.1 URS Behavior Based Safety Program.....................................................2-1 <br /> 2.2 Job Safety Analyses (JSA).......................................................................2-1 <br /> 2.3 Site Health and Safety Audits..................................................................2-1 <br /> 3. Section 3 THREE Responsibilities and Authorities.....................................................3-1 <br /> 3.1 Project Manager.......................................................................................3-1 <br /> 3.2 Site Safety Officer....................................................................................3-1 <br /> 3.3 Health and Safety Professional................................................................3-2 <br /> 3.4 Project personnel......................................................................................3-2 <br /> 3.5 Subcontractors..........................................................................................3-3 <br /> 3.6 Site visitors...............................................................................................3-3 <br /> 4. Section 4 FOUR Site Hazard Analysis..........................................................................4-1 <br /> 4.1 Physical Hazards........ ............................................................................4-1 <br /> 4.1.1 Temperature Extremes(SMS 018)..............................................4-1 <br /> 4.1.2 Adverse Weather..........................................................................4-2 <br /> 4.1.3 Noise(SMS 026)..........................................................................4-3 <br /> 4.1.4 Slips, Trips, and Falls (SMS 021)................................................4-3 <br /> 4.1.5 Lifting Hazards and Musculoskeletal injuries (SMS 045) ..........4-3 <br /> 4.1.6 Hand Safety(SMS 064)...............................................................4-3 <br /> 4.1.7 Fire Prevention and Protection(SMSs 014, 015, and 020)..........4-4 <br /> 4.1.8 Vehicle(Traffic) Hazards (SMS 032)..........................................4-4 <br /> 4.1.9 Excavation Safety Guidelines (SMS 013 & 034)........................4-5 <br /> 4.1.10 Portable Ladders (SMS 028)........................................................4-5 <br /> 4.1.11 Fall Protection(SMS 040)...........................................................4-6 <br /> 4.1.12 Fall Protection(SMS 040)...........................................................4-6 <br /> 4.1.13 Fall Protection(SMS 040)...........................................................4-6 <br /> 4.1.14 Fall Protection(SMS 040)...........................................................4-6 <br /> 4.1.15 Fall Protection(SMS 040)...........................................................4-6 <br /> 4.2 Biological Hazards (SMS 047)................................................................4-7 <br /> 5. Section 5 FIVE Health and Safety Requirements.........................................................5-1 <br /> 5.1 Personnel Training Requirements............................................................5-1 <br /> 5.2 Health and Safety Briefing....................................................................... 5-1 <br /> 5.3 Health and Safety Documentation........................................................... 5-2 <br /> umH:lWprocessl25532%WorldEnterprise%Well DestructionlAttachment C World Enterprises HSP TG edits.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.