Laserfiche WebLink
i <br /> Natalia Subbotnikova [E ] <br /> e <br /> From: Ro McClellon [EH] <br /> Sent: Tuesday,June 10, 2014 8:31 AM <br /> To: 'Taj Bahadori' <br /> Cc: Michael Carroll; Roy Constantino;Ardell Lindsey; Billy Baier; Desi Reno; Natalia <br /> Subbotnikova [EH] <br /> Subject: RE: SWIS Online Inspection Report on behalf of: nsubbotnikova@sjcehd.com:Corral <br /> Hollow Landfill <br /> Attachments: R. McClellon CH-LEA Inspections 040814sc.pdf <br /> Taj, I want to explain why this was placed on the inspection report. In your letter of April 8, 2014 (see <br /> attached). you stated that you would remove the soil from the top deck. You also provided a map <br /> indicating where you were going to store the soil. During the inspeciton my staff noted that the soil was not <br /> removed, but spread on the top deck (some soil was removed, but placed along the south slope of the <br /> site). Your plans changed and you did not notify the EHD. You did not comply with your letter of April 8. So, it <br /> was noted on the inspection report. The EHD has concerns that the area now covered with this soil does not <br /> or will not have erosion control. The soil may not support vegetative growth and may result in excessive <br /> erosion. The letter, to the RWQCB that you provided as an attachment to your email, is not clear that the top <br /> deck portion of the site is included in the proposed site activities. If you are going to expand the activities to <br /> include the top deck area then the EHD supports you efforts. If you have any question regarding this please <br /> contact me. Robert <br /> Robert McClellon, Program Coordinator REHS <br /> Environmental Health Department <br /> 1868 E. Hazelton Ave <br /> Stockton, CA 95205-6232 <br /> Phone (209) 468-0332 <br /> Fax (209) 468-8392 <br /> From: Taj Bahadori [mailto:tbahadori@sj oq v.org] <br /> Sent: Monday, June 09, 2014 4:05 PM <br /> To: Robert McClellon [EH] <br /> Cc: Michael Carroll; Joyesh Chandra; Roy Constantino; Ardell Lindsey; Billy Baier; Desi Reno; Natalia <br /> Subbotnikova [EH] <br /> Subject: RE: SWIS Online Inspection Report on behalf of: nsubbotnikova@sjcehd.com: Corral Hollow Landfill <br /> Hello Robert, <br /> As we stated in our April 8, 2014 letter,the soil piles on top deck were removed by June 1 (per EHD request), <br /> a small amount was left on the deck to repair existing depressions. The plan is to use some of the soil for <br /> erosion control and stockpile the remaining per our letter. We explained our Erosion Control Plan in the <br /> May 14, 2014 letter to the Water Board which you were cc'd on (attached). <br /> Also,we are changing the operation of the flare from continuous to semi-continuous per CCR Title 17 <br /> Section 59468(attached). Mike is working with the Air District to modify the permit. <br /> Please call if you have any questions,953-7316. <br /> Thanks,Taj <br /> Taj M. Bahadori, PE <br /> Senior Civil Engineer <br /> Phone: 209-953-7316 <br /> 1 <br />