From: Taj Banadori <tbahadori@sjgov.org> <br />Sent: Friday, August 22, 2014 8:33 AM <br />To: Robert McClellon [EH] <br />Cc: Natalia Subbotnikova [EH]; Michael Kith [EH] <br />Subject: FW: Corral Hollow Landfill Drainage Work, September 2 through 12 <br />Attachments: CH -Drainage Schedule Sept 2014-RevAug2l.pdf, CH -Erosion and reseed Sept 2014 <br />Figsl-4-RevAug2l.pdf <br />Attached please find figures and schedule for the drainage improvements at the Corral Hollow Landfill planned for <br />September 2 through 12. This work includes: <br />• Preparation of the closure area (northern corner of the landfill) for hydroseeding in the last two weeks of <br />September (Figures 1 and 2). This work required by the Water Board to restore the vegetation over the <br />closure area. <br />• Preparation of the side slopes of the retention pond for hydroseeding also in the last two weeks of <br />September (Figures 2 and 3) . <br />• Completion of two drainage berms, the soil for which was placed earlier: <br />o One berm to direct water around the retention pond to erosion -hardened flow paths (Figure 3). <br />o The other berm to direct water from south of the flare station to the retention pond, thereby <br />making the Corral Hollow Landfill a "non -discharge" site (Figure 4). <br />• Final contouring and seeding of the top deck (Figure 2). <br />• Miscellaneous other improvements, including removing the erosion debris from the CalTrans culvert <br />discharge area (Figure 2) and re -grading the V -ditch and re -setting the anti -erosion mat for that ditch (Figure <br />3). <br />We will continue staging rip -rap on site for this project beginning next week. <br />Mike Carroll will be on site each morning as the work proceeds. Please stop by, if you wish, to see our progress. <br />