My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2024-2025
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
CORRESPONDENCE_2024-2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2025 9:56:26 AM
Creation date
7/2/2024 8:53:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2024-2025
RECORD_ID
PR0440003
PE
4434 - LANDFILL DISPOSAL SITE - POST CLOSURE
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
31130 CORRAL HOLLOW RD TRACY 95376
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Joyesh Chandra <br /> January 23, 2024 <br /> Page 2 <br /> • For probes more than 20 feet deep,turn on sample pump, extract a minimum of one <br /> probe volume, observed and record methane,oxygen, and carboy dioxide gas <br /> concentrations, when readings have stabilized for 30 seconds. <br /> • Close test valve, disconnect sample instruments and secure sample location. <br /> GAS MONITORING WELL TESTING <br /> In accordance with the approved testing schedule,all perimeter GW probes are to be tested at a <br /> minimum, on a quarterly basis. On November 28, 2023, all perimeter gas monitor probes defined as <br /> GW Nos. 1 through 9 were tested. Test results (Table 1) indicated that all GW probes tested exhibited <br /> no methane gas concentrations during the monitoring event. The next required quarterly monitoring <br /> event,first quarter 2024(January through March), is scheduled to be performed before the end of the <br /> month of March 2024. <br /> STANDARD PROVISIONS <br /> This report addresses conditions at the subject site during the test date only. Accordingly, we <br /> assume no responsibility for any changes that may occur subsequent to our monitoring which could <br /> affect the quantity of LFG at the subject site or adjacent properties. <br /> Should you have any questions, do not hesitate to contact Justin Ruhle at(209) 279-4418. <br /> Sincerely, <br /> 'X A4& <br /> Rebecca L. Lucero Justin C. Ruhle <br /> Project Coordinator Project Manager <br /> SCS Field Services SCS Field Services <br /> cc M. Houghton <br /> J.Acevedo <br />
The URL can be used to link to this page
Your browser does not support the video tag.