Laserfiche WebLink
LDT Xerxes Mobilizations Cont. . . <br /> On June 13th, Xerxes crew was mobilized to site to <br /> isolate the seam from the tank. A double plate <br /> internal repair was used. <br /> On Junel6thThe tank was pressure tested (5 psi for <br /> 1 hour) and found to be tight in all three primaries <br /> dig <br /> "ft and the interstice. <br /> Xerxes crew filled the interstice with brine. The <br /> brine level was monitored overnight. Brine topped <br /> up minimally overnight. <br /> �j Li <br /> Ik 0 Xerxes crew left the site on June 17thafter handing <br /> over the tank to the site contractor and the owner. <br /> MattrPresentation Title <br /> rnif mtrutwre Techrmloglei <br />