Laserfiche WebLink
[M Outlook <br /> Re:SR0083837-4607 S.Airport Way,Stockton- Install Repairs <br /> From EH-UST<ust@sjgov.org> <br /> Date Thu 7/24/2025 2:48 PM <br /> To Shelley Gibson <Shelley.Gibson@mattr.com>;EH-UST<ust@sjgov.org> <br /> Cc David Beard <David.Beard@mattr.com> <br /> Hello Shelley, <br /> Thank you for the email. I will give it to the area inspector. <br /> Re:4607 Airport Way,Stockton <br /> San Joaquin County Environmental Health Department <br /> Underground Storage Tank,CUPA <br /> 1868 E.Hazelton Ave.,Stockton,CA 95205 <br /> Phone:(209)468-3420 1 Fax:(209)464-0138 <br /> UST Website:Environmental Health Department(5jgQv.org) <br /> �',�Seal-Logo-Greatness <br /> From:Shelley Gibson<Shelley.Gibson@mattr.com> <br /> Sent:Thursday,July 24,2025 2:19 PM <br /> To:EH-UST<ust@sjgov.org> <br /> Cc:David Beard<David.Beard @mattr.com> <br /> Subject:FW:SR0083837-4607 S.Airport Way,Stockton-Install Repairs <br /> Hey Stacy! <br /> I want to thank you and your team for the call yesterday.We have started an internal review <br /> based on your concerns and frustrations so that this does not occur again. <br /> I have put the extra testing requests below with comments about what we discussed or what I <br /> will provide as a substitution. <br /> 1. Primary tank test of all three tanks in the split tank, in accordance with manufacturer <br /> specifications.—No concern from Xerxes <br /> 2. Secondary containment tank test of the split tank(interstice testing), in accordance with <br /> manufacturer specifications, prior to brine filling.—Please see attached Truchek documents <br /> as proposed substitution testing. <br /> 3. Confirmation of interstice continuity for all three compartments in the split tank.—Prior to <br /> Truchek Testing,Xerxes will install a small diameter riser in an end tank sump(see tank dwg <br /> 669-665 attached for proposed sump). Based on the tank layout, pIs advise if you would like <br /> to test the other shell or compartment. <br /> 4. Secondary piping test: Pressure testing of all piping (product,vapor recovery,vent,and <br /> chase), in accordance with manufacturer specifications.—Done by Petroleum Contractor <br />