Laserfiche WebLink
<alex.korek@diamondzengineering.com>;alex.kandathil@mattr.com<aIex.kandathiI@rnattr.corn>; <br /> den nis.hockenberry_@ Mattr.corn<den nis.hocke n berryLa)Mattr.com>;robert.dubois@mattr.com <br /> <robert.dubois@rnattr.corn>;michel le.reed@ mattr.corn<rnichel le.reed@ mattr.corn>;car etter@rnattr.corn <br /> <cary.etter(@nnattr.corn>;david.beard@mattr.com<david.bearc1@mattr.corn>; atrick(@bostonmcdermott.com <br /> < atrick@bostonmcclernnott.corn>;stefanfibe glassunlinnitedinc@ <br /> grnail.corn <br /> <stefanfiber-Rlassunlimitedinc@gmail.com> <br /> Subject:Re:SR0083837-4607 S.Airport Way,Stockton-Install Repairs <br /> Thank you for the email. <br /> We plan on performing the secondary test on the piping and the tank primary test for you on <br /> Monday. <br /> MTTR Team, Please coordinate the other testing that the county is requiring. <br /> SEAN MURPHY <br /> CEO/OWNER <br /> TOWN&COUNTRY CONTRACTORS INC. <br /> 3206 LUYUNG DR <br /> RANCHO CORDOVA'CA 95742 <br /> (0)916-636-9500 <br /> (C) 916-997-4527 <br /> (F)916-636-9507 <br /> SEAN@.TCCONTRACTORS.COM <br /> From:Rivera,Stacy[EHD]<srivera@sjggv.org> <br /> Sent:Wednesday,July 16,2025 5:00:47 PM <br /> To:Gurkarnal Dhaliwal<g.dhaIiwaI@norcaIoffice.corn> <br /> Cc:CJ Dhaliwal<�j.dhaIiwal@norcaIoffice.corn>;Saetern,Kristina Gaen[EHD1<ksaetern sjgov.org>;SeanMurphy <br /> <Sean @tccontractors.corn>;s.mann@norcaloffice.com<s.rnann@norcaIoffice.corn>; <br /> alex.korek@diamondze gineering.com<alex.korek@,diamondzengineering.com>;alex.kandathil@mattr.com <br /> <aIex.kandatb_�i1L@rnattr.conn>;den n is.hocken berry-@ mattr.corn<den n is.hockenberry_@ Mattr.corn>; <br /> robert.dubois@mattr.com<robert.dubois@rnattr.corn>;rn ichel le.reed@ mattr.com<rnichel le.reed@ mattr.corn>; <br /> car etter@rnattr.corn<car etter@rnattr.corn>;clavid.beard@ mattr.com<david.beard@ mattr.corn>; <br /> patrick@.bostonmcdermott.com< atrick@.bostonrncderrnott.corn>;stefanfibe glassunlimitedinc(@gmail.com <br /> <stefanfiberglassunlimitedinc@gmail.com> <br /> Subject:SR0083837-4607 S.Airport Way,Stockton-Install Repairs <br /> Good afternoon, <br /> Following the repairs that were made to the newly installed, not yet approved underground storage <br /> tanks,our department will be requiring the following inspections in addition to those already listed <br /> on the UST installation approval letter: <br /> 1. Primary tank test of all three tanks in the split tank, in accordance with manufacturer <br /> specifications. <br /> 2. Secondary containment tank test of the split tank(interstice testing), in accordance with <br /> manufacturer specifications, prior to brine filling. <br /> 3. Confirmation of interstice continuity for all three compartments in the split tank. <br /> 4. Secondary piping test: Pressure testing of all piping(product,vapor recovery,vent,and <br /> chase), in accordance with manufacturer specifications. <br /> 5. Integrity testing of all tank top sumps, in accordance with manufacturer specifications. <br />