Laserfiche WebLink
Environmental Health Department <br /> SAN17d:0 A Q U I N <br /> —COUNTY <br /> Gre�atpess qriDws here. <br /> Service Request Inspection Report <br /> Name of Facility: ARCO Date: 08/19/2025 <br /> Address: 4607 S AIRPORT WAY, STOCKTON 95206 <br /> Requestor: Airport Petroleum, LLC elephone: (925)446-0361 <br /> Program Element: 2303- LIST/PIPING INSTALLATION Request#: SR0083837 <br /> Inspection Type: 131 -UST INSTALLATION INSPECTION <br /> Onsite Service Technician: Ariel Barrantes ICC Service Tech/Installer Exp. Date: 08/01/2026 <br /> Manufacturer training: Xerxes, 05/11/26 <br /> OVERALL INSPECTION NOTES AND COMMENTS <br /> NOTES <br /> On site for the inspection were inspectors J.Alaniz and A.Asio.Met with the following individuals: <br /> -CJ Dhaliwa,Owner, Ignacio Aguilar,Fiberglass Unlimited, Ariel Barrantes,Town and Country <br /> Town and Country Testing-The following tests were conducted and witnessed: <br /> Primary Tank Tests <br /> Diesel#2,Biodiesel 20,and Diesel Exhaust Fluid(DEF)tanks <br /> Result:Passed <br /> Secondary Piping Tests <br /> -87 Octane,91 Octane,Diesel#2,Biodiesel 20,Chase,and Vapor lines <br /> -Result:Passed <br /> Fiberglass Unlimited Testing-The following tests and verifications were performed: <br /> Brine Type Verification <br /> -Confirmed brine type is consistent with Xerxes specifications. <br /> Interstice Continuity Test <br /> Conducted on Diesel#2 and Biodiesel 20 tanks <br /> Result:Passed <br /> Observations: <br /> Annular riser pipe located between the 8th and 9th ribs on the Biodiesel base tank. <br /> Viewing port installed between the 7th rib and STP sump on the Diesel#2 tank. <br /> Brine was introduced through the annular riser pipe and continuity was verified through the viewing port. <br /> TruChek Hydrostatic Monitoring—Viewed start of initial 1 0-Hour Test <br /> Brine level raised in the riser pipe to approximately 11 inches. <br /> Approx.3.5 gallons of brine used. <br /> Start Time:10:50 AM <br /> Scheduled Completion:8:50 PM <br /> Final verification to be completed by another inspector. <br /> Not approved to receive fuel. <br /> Not approved for operation. <br /> Additional inspections are required.Refer to the approval letter dated June 14,2024,for a full list of outstanding requirements. <br /> Please submit inspection requests in writing to UST@sjgov.org with 48 hours advance notice. <br /> The person in charge is responsible for ensuring that the above mentioned facility is in compliance with all applicable sections of the California Health and <br /> Safety Code.If a reinspection is required,fees will be assessed at the current hourly rate. <br /> Received by: Name and Title: Emailed to Sean Murphy, Contractor <br /> EH Specialist: KRISTINASAETERN Phone: (209)616-3045 <br /> FA0024830 SR0083837 SC131 08/19/2025 <br /> EHD Rev.09/16/2020 Page 1 of 1 Service Request Inspection Report <br />