Laserfiche WebLink
To: Rivera, Stacy [EHD] <srivera@sjgov.o g>;Alex Kandathil <Alex.Ka nclath i I@)mattr.com> <br /> Cc: CJ Dhaliwal <c dhaliwal@norcaloffice.com>; EH-UST<ust sjgov.o g>; Dennis Hockenberry <br /> <den n is.hockenberry@ mattr.com>; Robert Dubois<Robert.Dubois@,mattr.com>; Michelle Reed <br /> <Michelle.Reed@ mattr.com>; Cary Etter<car etter@mattr.com>; David Beard <David.Beard@ mattr.com>; <br /> Patrick McDermott<patrick(@bostonmcdermott.com>; stefanfibe glassunlimiteding gmail.com; Kevin Amick <br /> <kamick@shieldsharper.com>; Sandy Mann <s.mann@norcaloffice.com>; Gurkamal Dhaliwal <br /> <g.dhaliwal@norcaloffice.com>; SeanMurphy<Sea n.@tccontractors.com>; 'Daniel Garcia' <br /> <fiber lassun limitedincdg@gmail.com>; 'Chris Schulz' <fiberglassu n limited i nc@ <br /> —9 gmail.com>; Saetern, Kristina <br /> Gaen [EHD] <Lsaetern@sjgov.o g>;Alaniz,John [EHD] <jalanizl@sjgov.o g> <br /> Subject: RE: ***URGENT***-250306-1 -Stockton Arco#4607-Stockton, CA-Brine in primary <br /> Hey Stacy! <br /> Wonderful speaking with you this afternoon! I have laid out the proposed Truchek plan as per <br /> our discussion below. Please confirm with a reply all that it is acceptable for us to start the <br /> Truchek early so that your team is able to witness the finish and the remainder of the testing <br /> tomorrow. <br /> I cannot speak to the availability onsite but would hazard a guess that 8am is sufficient. <br /> In response to your questions: <br /> 1. For the 1 Oh test, we would like your permission to start early such that it can finalize <br /> while your team is on site. To help alleviate concerns, we will document with photos the <br /> initial level and have the level noted in permanent marker on the riser. This will mean <br /> that the interstice continuity test will be watching the brine drop vs watching it climb. <br /> 2. All brine currently in the tank AND to be added comes from Xerxes. Fiberglass <br /> Unlimited (techs onsite) uses only pre-mixed brine directly from Xerxes plants. Xerxes <br /> brine is identifiable by it's green-blue colouring. <br /> 3. The riser will be placed on the end compartment which is a separate compartment from <br /> the brine reservoir. There will be a visible seam on the outside between the reservoir <br /> and temporary riser that the techs can point out to your team. <br /> 4. Time will be needed to repair the riser, so depending on the timing and the response to <br /> point #1, we may need to schedule that test for another day. <br /> The testing to be concluded tomorrow shall be 1 Oh Truchek testing, witnessing of the brine <br /> level change during brine addition/removal to confirm interstice continuity, a primary pressure <br /> test on all 3 compartments and I believe the sump top integrity & secondary piping testing by <br /> Town and Country. <br /> Regards, <br /> Shelley Gibson <br /> Product Engineer <br /> Xerxes <br /> Mobile: 780-887-8743 <br /> Shell y.Gibson mattr.com <br /> www.mattr.com I www.xerxes.com <br /> :� XERXES" <br /> 1103 Parsons Road SW,Edmonton,Alberta,T6X OX2,Canada <br /> Xerxes places the highest priority on the security and privacy of our Clients.Therefore,we have <br />