Laserfiche WebLink
Environmental Health Department <br />CP22 - AST Non-Qualified Inspection Report <br />Date: <br />May 21, 2024 <br /> Facility Address: <br /> 2800 TURNPIKE RD, STOCKTON <br /> Facility Name: <br /> VALLEY FARMS TRANSPORT <br /> □ OUT □ R □ COS4045 - Release/Leaks/Spills - General Local Ordinance 86 <br /> □ OUT □ R □ COS4050 - Abandonment/Illegal Disposal/Unauthorized Treatment - General See below 87 <br /> □ OUT □ R □ COS4055 - Abandonment/Illegal Disposal/Unauthorized Treatment - General Local Ordinance 88 <br />SUMMARY OF VIOLATIONS <br />(CLASS I, CLASS II, or MINOR - Notice to Comply) <br />RemarksItem # <br />Code of Fed Regulations 112.5(a), 112.5(b) 4010010 - Facility has amended SPCC as necessary. <br />OBSERVATION: The facility failed to amend the Spill Prevention, Control, and Countermeasure (SPCC) Plan within six <br />months of when there was a change in design, construction, operation, or maintenance, which affects the facility’s <br />discharge potential. <br />-The SPCC Plan lists AST-1 (diesel fuel) as a 10,000-gallons capacity tank, which is not longer on site. Manager Erik <br />Sandoval stated that the tank observed on site at the time of inspection, which replaced the 10,000-gallon tank, has a <br />storage capacity of 15,546-gallons. The exact date of installation for the tank was not confirmed by the facility. <br />-The SPCC Plan lists the storage capacity of AST -2 (motor oil) and AST-3 (used oil) as 110-gallons each. The tanks <br />observed on site at the time of inspection in the location of AST -2 and AST-3 as illustrated by the site map, were two <br />400-gallon ASTs. <br />REGULATION GUIDANCE: (a) Amend the SPCC Plan for your facility in accordance with the general requirements in <br />§ 112.7, and with any specific section of this part applicable to your facility, when there is a change in the facility <br />design, construction, operation, or maintenance that materially affects its potential for a discharge as described in § <br />112.1(b). <br />CORRECTIVE ACTION: Ensure that the SPCC Plan has been amended, as required, and it accurately represents <br />facility design, procedures, and policies currently in place. Provide proof of correction to the EHD. <br />This is (Minor) Violation. <br /> 7 <br />Code of Fed Regulations 112.5(b) 4010009 - 5 year review performed on SPCC and documented. <br />OBSERVATION: The facility failed to perform the 5-year review of the SPCC plan. The Spill Prevention, Control, and <br />Countermeasure (SPCC) Plan was last certified on 3/7/2019. No 5-year review statement or PE certification was <br />completed before the 5-year review deadline of 3/7/2024. <br />REGULATION GUIDANCE: (b) Notwithstanding compliance with paragraph [112.5] (a) of this section, complete a <br />review and evaluation of the SPCC Plan at least once every five years from the date your facility becomes subject to <br />this part; or, if your facility was in operation on or before August 16, 2002, five years from the date your last review was <br />required under this part. As a result of this review and evaluation, you must amend your SPCC Plan within six months <br />of the review to include more effective prevention and control technology if the technology has been field -proven at the <br />time of the review and will significantly reduce the likelihood of a discharge as described in § 112.1(b) from the facility. <br />You must implement any amendment as soon as possible , but not later than six months following preparation of any <br />amendment. You must document your completion of the review and evaluation , and must sign a statement as to <br />whether you will amend the Plan, either at the beginning or end of the Plan or in a log or an appendix to the Plan. The <br />following words will suffice, “I have completed review and evaluation of the SPCC Plan for (name of facility) on (date), <br />and will (will not) amend the Plan as a result.” <br />CORRECTIVE ACTION: Immediately complete and document the 5-year review of the SPCC Plan and make any <br />necessary amendments (a Professional Engineer must certify any technical amendments). Submit verification of <br />adequate SPCC plan review completion to the EHD. <br /> 10 <br />FA0003774 PR0516358 SC001 05/21/2024 <br />EHD Rev. 12/06/2021 CP22 - AST Non-Qualified OIRPage 5 of 12 <br />1868 E. Hazelton Avenue | Stockton, California 95205 | T 209 468-3420 | F 209 464-0138 | www.sjgov.org/EHD