My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6131
>
2300 - Underground Storage Tank Program
>
PR0231223
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 9:09:34 AM
Creation date
8/6/2024 7:47:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0231223
PE
2361 - UST FACILITY
FACILITY_ID
FA0002324
FACILITY_NAME
PACIFIC AVE
STREET_NUMBER
6131
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09746418
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
6131 PACIFIC AVE STOCKTON 95207
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Facility/Site <br />Pacific Ave. UST Tank#/CERS Tank CERS ID <br />ID ft 10180905 <br />131 PACIFIC AVE TA0122304 / <br />10180905-001 <br />TOCKTON, CA 95207 Tank Info: Installed Date: l/1/199012:00:00 AM - Tonic Use: Motor Vehicle Fueling -Tank <br />Contents: Regular Unleaded . Type Of Tank: Double Wall - Piping Construction: Double - <br />walled <br />Pipe Monitoring is Performed Using the Following Method(s) <br />Yes Continuous Monitoring of Piping Secondary Containment <br />Piping Secondary Containment Panel Manufacturer Leak Sensor Manufacturer <br />Dry Veeder Root Veeder Root <br />Panel Model # Leak Sensor Madel # <br />TLS350 794380-352 <br />es Leak Alarm Triggers Automatic Pump Shutdown <br />Yes Failure/Disconnect Triggers Pump Shutdown <br />Mechanical Line Leak Detector Performs 3 GPH Leak Test <br />MLLD Manufacturer MLLD Model <br />Yes Electronic Line Leak Detector Performs 3 GPH Leak Test <br />ELLD Manufacturer ELLD Programmed In Line Testing ELLD Triggers Automatic Pump Shutdown <br />eeder Root Yes <br />LLD Model ELLD Failure/Disconnect Triggers Automatic Shutdown <br />PLLO Yes <br />Pipeline Integrity Testing Visual Pipeline Monitoring <br />Pipeline Integrity Testing Frequency Visual Pipeline Monitoring Frequency <br />Suction Piping Meets Exemption Criteria <br />No Regulated Piping Per Health and Safety Code, Division 20, Chapter 6.71s Connected To The Tank System <br />Other Pipeline Monitoring <br />Under Dispenser Containment (UDC) Monitoring <br />DC Monitoring Detection of Leak into UDC Triggers Audible and Visual Alarms <br />Float and Chain Assembly <br />UDC Leak Alarm Triggers Automatic Pump Shutdown <br />OC Panel Manufacturer <br />Failure/Disconnection of UDC Monitoring System Triggers Automatic Pump Shutdown <br />DC Panel Model # <br />UDC Monitoring Stops Flow of Product at Dispenser <br />DC Leak Sensor Manufacturer Yes <br />BRAVO UDC Construction <br />DC Leak Sensor Model Single -walled <br />lost and Chain UDC Secondary Containment Monitoring <br />Leak Within Secondary Containment of UDC Causes Audible and Visual Alarms <br />eriodic SyStenTesting <br />ELD Testing <br />es Secondary Containment Testing <br />es 5 ill Bucket Tastin <br />Printed on 9/7/20244:25 AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.