Laserfiche WebLink
SP001 Tank Inspection Report <br />Interstate Truck Center, 2110 S. Sinclair Ave. Stockton, CA <br />September <br />2024 <br /> <br /> Strandberg Associates 1(650) 796.9732 john@strandbergassociates.com 18 <br /> <br /> <br /> <br />Category I <br />Time to next Formal External <br />Inspection, yr 20 <br />Date of next Formal External <br />Inspection 2044 <br /> <br />• The next formal external inspection is due in 2044. <br /> <br />Engineers Note: Overfill prevention is provided by taking the tank level from the <br />continuous tank monitor and calculating the fuel delivery quantity. The quantity is then <br />given to the filling operator who delivers the quantity to the tank. The tank is equipped <br />with an audible high-level alarm as a guard against overfilling the tank. The delivery <br />quantity shall not fill the tank to over 90 percent of the tanks volume. <br />Fit For Service <br />• The tank is found to be fit for service by meeting the Suitability for Continued <br />Service requirement listed in Section 10 of STI SP001.