My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORONADO
>
3807
>
2300 - Underground Storage Tank Program
>
PR0231066
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2025 3:24:38 PM
Creation date
8/26/2024 9:14:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0231066
PE
2361 - UST FACILITY
FACILITY_ID
FA0003819
FACILITY_NAME
Sprint United Managemnt Co.
STREET_NUMBER
3807
STREET_NAME
CORONADO
STREET_TYPE
AVE
City
Stockton
Zip
95204
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
3807 Coronado AVE Stockton 95204
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br />Monitoring System Certification Form <br />Page 4 of 6 <br />7. LINE LEAK DETECTOR TESTING <br />Check this box if line leak detectors ARE NOT installed. (Do not complete this section.) <br />Simulated release rate verified: (Check all that apply.) <br />3 GPH 0.1 GPH 0.2 GPH Yes No NA <br />Has the testing apparatus been properly calibrated? <br />For emergency generator tank systems, does the LLD create an audible and visual <br />alarm when a leak is detected? <br />For mechanical LLDs, does the LLD restrict the flow through the pipe when a <br />release is detected? <br />For electronic LLDs, does the turbine automatically shut off when a release is <br />detected? <br />For electronic LLDs, does the turbine automatically shut off if any portion of the <br />monitoring system is disabled or disconnected? <br />For electronic LLDs, does the turbine automatically shut off if any portion of the <br />monitoring system malfunctions or fails a tightness test? <br />For electronic LLDs, have all accessible wiring connections been visually inspected <br />for kinks and breaks? <br />Were all items on the equipment manufacturers maintenance checklist completed? <br />Were all LLDs confirmed operational within regulatory requirements? <br />LLD ID LLD Model Lines Monitored Pass Fail <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Describe all answers marked No or Fail and proposed remedy in Section 9. <br />List all monitoring equipment either replaced or repaired in Section 9
The URL can be used to link to this page
Your browser does not support the video tag.