Laserfiche WebLink
SAN1 Q A Q U I N Environmental Health Department <br /> --C 0 U N 'I Y ----....-. <br /> Service Request Daily Time and Activity Summary from 8/23/2020 to <br /> 8/23/2023 for SR0087073 located at <br /> HYP <br /> Activity Date Recorded by <br /> 08/21/2023 New Yoga building with Juice bar. PE 1601 FAHMY <br /> 90 min I called operator to send me the spec sheet of the cloth washer and the electric SC 523 <br /> heater that will be used. <br /> As per operator, mop sink will be installed in the laundry room. <br /> Regarding the finish schedule, she will send me some specs later. <br /> Approval letter with condition is prepared but pending for the requested specs to <br /> calculate the water demand. <br /> 08/23/2023 One of the operator came to our office with the set of plans submitting for the PE 1601 FAHMY <br /> 48 min Juice bar in the Yoga place. SC 523 <br /> He has a lot of question of the tankless water heater that he need to install. He <br /> stated that the juice bar ( prep sink, 3 comp sink and hand sink )will be connected <br /> to one water heater and the 5 showers, mop sink, washer and 5 rest rooms hand <br /> sinks will be connected on another water heater. <br /> I did for him the calculation of the water demand of the tankless heater <br /> Juice bar will need minimum 3 GPM at 60 degree rise. The other area needs 16.5 <br /> GPM at 60 degree rise. He provided me with heater spec sheet. <br /> Also we discussed the finish schedule. <br /> He will be using polished concrete with schluter and FRP/Semi gloss paint at the <br /> Juice bar, rest rooms and mop sink area and he will use tiles, schluter and granite <br /> slab at the 5 showers. <br /> So I updated the approval letter with condition with the minimum water heater <br /> requirement before sending plans and letter for 2nd review and signature. <br /> Page 1 of 1 <br />