Laserfiche WebLink
Underground Storage Tank <br />Monitoring System Certification Form <br />10. MONITORING SITE PLAN <br />Date site plan was prepared: <br />If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br />with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br />identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br />a legend for all symbols depicted. <br />Site Address: San Joaquin Regional Transit— 2849 E Myrtle Street Stockton, CA 95201 <br />*PIPING * <br />(ARROWS)........................................................ <br />Drawingofpiping . . . . . . . . . . . . . . . . . . . . . . . . . . KEY <br />exit of sump and . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A = ANNULAR <br />UDC's. No . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F = FILLS <br />underground • • • • • . . . • • • • • T=TURBINE <br />drawing is � 87. P =PROBE <br />accurate, we . . . . . . . . .VENT. V =VAPOR <br />cannot speculate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . S = SUAIP SENSOR <br />blueprunts. • , , . . . . , • • • . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . L=LealeDetector <br />cff-t . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Dl=nianway <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C - Floats & Chains <br />. . . E = E Stop <br />P. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. T I T . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. B P B . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. I . . . . . . . . . . . . . . . . . B . . . . . . . . . . . . . . . . . . . . . . . . . . <br />..........................S <br />............ <br />.......................... <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . <br />B <br />. at <br />` . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . O . . . . . . . . . . . . . . . . . . . . <br />P r............ <br />B <br />. . . . e . . . . . . ..11 * ATG. . <br />. B DSL VENT . . . . . . . . . . . . . . . . . <br />s <br />... ............. ... <br />14L .... .... . . .. . . DSL. . . ..DSL... .. .87 .. . . .. . . . . . . . . . ... . . ..... . <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . .Trans Vent. . . . . . <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. • Aitems underground that are not visible to the certif},ing technician are a <br />prony fessional opirniarr anlP arnd are solely far• it1%r•nnatio»al purposes. Dranving <br />nol to scale <br />Date map was drawn: 9/24120 <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring System Certification. On your site plan, <br />show the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors monitoring lank <br />annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in -tank liquid level <br />probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br />Monitoring System Certification <br />Page 4 of 4 2/21/07 <br />Page 6 of 6 <br />