My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
15250
>
2800 - Aboveground Petroleum Storage Program
>
PR0539991
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 3:34:32 PM
Creation date
10/23/2024 11:13:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0539991
PE
2832 - AST FAC 10 K - </=100 K GAL CUMULATIVE
FACILITY_ID
FA0021886
FACILITY_NAME
Love's Travel Stop #538
STREET_NUMBER
15250
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
Lodi
Zip
95242
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
15250 N THORNTON RD Lodi 95242
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Underground Storage Tank <br />Monitoring System Certification Form <br /> <br /> <br />Page 5 of 6 <br /> <br /> <br />8. IN-TANK GAUGING TESTING <br /> <br />☐ Check this box if tank gauging is used only for inventory control. <br />☐ Check this box if NO tank gauging equipment is installed. <br /> (Do not complete this section if either box is checked.) <br />Yes No NA <br />All wiring has been: 1) visually inspected for kinks, breaks and proper entry and <br />termination; and 2) tested for ground faults? ☐ ☐ ☐ <br />Were all in-tank gauging probes visually inspected for damage and residue buildup <br />to ensure that floats move freely, functionally tested, and confirmed operational? ☐ ☐ ☐ <br />Was accuracy of system’s product level readings tested? ☐ ☐ ☐ <br />Was accuracy of system’s water level readings tested? ☐ ☐ ☐ <br />Were all probes reinstalled properly? ☐ ☐ ☐ <br />Were all items on the equipment manufacturer’s maintenance checklist completed? ☐ ☐ ☐ <br /> <br />Probe ID Probe Model Tanks Monitored Pass Fail <br /> ☐ ☐ <br /> ☐ ☐ <br /> ☐ ☐ <br /> ☐ ☐ <br /> ☐ ☐ <br /> ☐ ☐ <br /> <br />9. COMMENTS <br /> <br />Describe all answers marked “No” or “Fail” and proposed remedy. <br />List all monitoring equipment either replaced or repaired. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.