Laserfiche WebLink
$67758&.6,'( <br />0RQLWRULQJ6\VWHP&HUWLILFDWLRQ <br />Page 4 of 6 <br />7. LINE LEAK DETECTOR TESTING <br />܆܆ Check this box if line leak detectors ARE NOT installed. (Do not complete this section.) <br />Simulated release rate verified: (Check all that apply.) <br />܆܆ 3 GPH ܆܆ 0.1 GPH ܆܆ 0.2 GPH Yes No NA <br />Has the testing apparatus been properly calibrated?܆܆ ܆܆ ܆܆ <br />For emergency generator tank systems, does the LLD create an audible and visual <br />alarm when a leak is detected?܆܆ ܆܆ ܆܆ <br />For mechanical LLDs, does the LLD restrict the flow through the pipe when a <br />release is detected?܆܆ ܆܆ ܆܆ <br />For electronic LLDs, does the turbine automatically shut off when a release is <br />detected?܆܆ ܆܆ ܆܆ <br />For electronic LLDs, does the turbine automatically shut off if any portion of the <br />monitoring system is disabled or disconnected?܆܆ ܆܆ ܆܆ <br />For electronic LLDs, does the turbine automatically shut off if any portion of the <br />monitoring system malfunctions or fails a tightness test?܆܆ ܆܆ ܆܆ <br />For electronic LLDs, have all accessible wiring connections been visually inspected <br />for kinks and breaks?܆܆ ܆܆ ܆܆ <br />Were all items on the equipment manufacturer’s maintenance checklist completed?܆܆ ܆܆ ܆܆ <br />Were all LLDs confirmed operational within regulatory requirements?܆܆ ܆܆ ܆܆ <br />LLD ID LLD Model Lines Monitored Pass Fail <br />܆܆ ܆܆ <br />܆܆ ܆܆ <br />܆܆ ܆܆ <br />܆܆ ܆܆ <br />܆܆ ܆܆ <br />܆܆ ܆܆ <br />܆܆ ܆܆ <br />܆܆ ܆܆ <br />܆܆ ܆܆ <br />܆܆ ܆܆ <br />܆܆ ܆܆ <br />܆܆ ܆܆ <br />Describe all answers marked “No” or “Fail” and proposed remedy in Section 9. <br />List all monitoring equipment either replaced or repaired in Section 9 <br />Q-1 PLLD DIESEL 3 <br />Q-2 PLLD DIESEL 2 <br />✔ <br />✔ <br />✔ <br />✔ <br />✔ <br />✔ <br />✔ <br />✔ <br />✔ <br />✔ <br />✔ <br />✔