Laserfiche WebLink
<br />2 of 2 <br />Environmental Health Department <br /> <br /> <br />8. No ELD work plan has been provided. <br /> <br />9. Provide one complete and current contractor’s training certifications for installation <br />and testing of all proposed UST equipment/components: One Technician must have <br />all complete manufacturer training certification for all UST components for <br />installation and one technician must also have all the complete certification for <br />testing. So far D. Juan is close for installations but not complete for testing. <br /> <br />10. Provide compatibility for all monitoring system components (tank, piping, <br />containment sumps, pumping equipment, release detection equipment, overfill <br />prevention equipment) with the substance to be stored (E85, Diesel, gasoline) <br /> <br />If you have any further questions, please contact me at (209) 616 3049. <br /> <br /> <br />Thank you, <br /> <br /> <br />Paul Nso <br />Environmental Health Specialist <br /> <br />Note: Drawing plans have not yet been reviewed. <br /> <br /> <br />