My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
87-2605
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
1815
>
4200/4300 - Liquid Waste/Water Well Permits
>
87-2605
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2019 10:11:27 PM
Creation date
12/3/2017 5:36:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200/4300 - Liquid Waste/Water Well Permits
RECORD_ID
87-2605
STREET_NUMBER
1815
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
SITE_LOCATION
1815 NAVY DR
RECEIVED_DATE
07/08/1987
P_LOCATION
CARNATION CAN DIV
Supplemental fields
FilePath
\MIGRATIONS\N\NAVY\1815\87-2605.PDF
QuestysFileName
87-2605
QuestysRecordID
1867557
QuestysRecordType
12
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. Oscar. Ilacad 1i <br /> Carnation . <br /> Monitoring Well Details <br /> Page; 1 <br /> KXgITORING WELL CONSIMMON/DEVELOPHW <br /> A ground water monitoring well will be completed to a depth of W feet ' <br /> below the ground water table or 5 feet into any clay layer. The wall will be <br /> constructed of schedule 40, 4" PVC pipe, factory perforated with a minimum of <br /> a 0.020 inch slotted screen which will extend S feet below the top of the <br /> upper zone of saturation, unless site conditions require otherwise. <br /> The hole will be finished with a Christy Box grouted with a slope to <br /> about � inch above the existing grade. The well will have a surface seal <br /> extending downward at least four feet from the ground surface within the annu- <br /> lar space, will have a PVC cap to prevent surface contamination, and will be. <br /> used during monitoring well construction. After installation, the well will be <br /> developed by pumping or by�bailing and swabbing. <br /> MONITORING i EEL SAMp'l M <br /> Following an initial water Level measurement, the ground water monitoring <br /> well will be sampled using a clean teflon bailer. The bailer will be usedi <br /> first to obtain a sample. from the surface of the water in each well prior to <br /> purging. If a layer of product is detected in the bailer, a sample of the <br /> floating product will be collected and analyzed. If no visable product exists <br /> in the well, three to ten well volumes of water will be removed by bailing or <br /> pumping before sample will be collected using a teflon bailer which has been <br /> steam cleaned with distilled water. <br /> All water samples will be sealed it laboratory cleaned glass containers <br /> with teflon lined lidsi labeled, and immediately placed in iced storage. A <br /> Chain-of-Custody form will be initiated by the sampler and will accompany the <br /> sample to the analytical laboratory. <br /> S <br />
The URL can be used to link to this page
Your browser does not support the video tag.