Laserfiche WebLink
PA-2400217 (A), PA-2400219 (ME), PA-2400220 (GP), Early Consultation/ Re-, SU- Page 2 of 3 <br /> 12 E. Hurd Road, French Camp, APN: 193-170-17, -18, -19, -20 November 7, 2024 <br /> 4) Construction of an individual domestic water well under permit and inspection by the <br /> Environmental Health Department is required at the time of development (San Joaquin <br /> County Development Title, Section 9-601.010 (b)). <br /> 5) Submit two (2) hardcopy sets, or one (1) electronic version, of food facility plans to the <br /> Environmental Health Department for review and approval prior to issuance of building <br /> permit(s) (California Retail Food Code, Article 1, 114380). The fee will be based on the <br /> current schedule at the time of payment. <br /> 6) A valid permit from EHD is required prior to operating food facility (California Retail Food <br /> Code, Chapter 13, Article 1, Section 14381) <br /> 7) Submit Water Provision Declaration form and Supplemental Water Provision Declaration <br /> form to the Environmental Health Department for review. Please contact Natalia <br /> Subbotnikova, Program Coordinator, Small Public Water System Program, at (209) 468- <br /> 0338, for any questions. <br /> 8) Applicant shall contact Natalia Subbotnikova, Program Coordinator, Small Public Water <br /> System Program, at (209) 468-0338, to determine if the existing well can be permitted as a <br /> public water system prior to issuance of building permits. If a public water system is required, <br /> applicant shall submit a Small Public Water System preliminary technical report to the <br /> California State Water Resources Control Board, Division of Drinking Water (Water Board) <br /> at least six months before initiating construction of any water related improvement, as <br /> defined. The issuance of a permit to operate a small public water system by the local primacy <br /> agency (EHD) is prohibited without the concurrence of the Water Board. Please contact <br /> Gena Farley with the SWRCB Division of Drinking Water at <br /> Gena.Farley@waterboards.ca.gov or 209-948-7488, concerning the requirements for <br /> preliminary technical report submittal prior to issuance of building permits. <br /> If the Water Board determines that an onsite well shall be used as the potable water source, <br /> a permit application to operate Small Public Water System shall be submitted to the EHD <br /> for approval prior to issuance of building permits. To issue a permit to operate, concurrence <br /> from the Water Board is required. A yearly permit to operate a public water system will be <br /> required by the EHD prior to sign off of the certificate of final occupancy (San Joaquin County <br /> Development Title, Section 9-602.010 and 9-601.030.). <br /> The supplier must possess adequate financial, managerial, and technical capability to <br /> assure delivery of pure, wholesome, and potable drinking water in accordance with San <br /> Joaquin County Development Title, Sections 9-602.010 and 9-601.030 and C.C.R., Title 22, <br /> and Health and Safety Code, Section 116525 116570. <br /> 9) The existing private water wells shall be tested for nitrates with the results submitted to the <br /> Environmental Health Department prior to recordation of the Parcel Map. Samples are to be <br /> taken and analyzed by a State-approved laboratory. (San Joaquin County Development <br /> Title, Section 9-601.0200)). <br /> 10) According to EHD records, there are existing domestic well records SR0062006 and <br /> SR0062471, and these wells shall be destroyed under permit and inspection by the EHD <br /> (San Joaquin County Development Title, Section 9-605.010 & 9-601.020) <br />