My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2023 AS BUILT
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
4343
>
2300 - Underground Storage Tank Program
>
PR0548708
>
INSTALL_2023 AS BUILT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2024 2:16:23 PM
Creation date
12/10/2024 2:15:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2023 AS BUILT
RECORD_ID
PR0548708
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0027878
FACILITY_NAME
IGRA INVESTMENTS INC
STREET_NUMBER
4343
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95391
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4343 WILSON WAY STOCKTON 95391
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />Presto, Carol [EHD] <br />From:LathamZubillaga <Latham@tccontractors.com> <br />Sent:Monday, November 25, 2024 2:29 PM <br />To:Presto, Carol [EHD]; SeanMurphy; GARY SANDHU <br />Cc:MiguelCeja; MarkFarmer <br />Subject:Re: Wilson Chevron-4343 Wilson Way Stockton-Approval to Receive Fuel <br />Hello Carol, <br /> <br />Tank #2 and Tank #3 share the same annular space. This is the split tank for this site. I put the UL number for <br />this tank in the box for #2 and #3. They are both 10’ diameter. The fluid levels on the tanks were Tank #1: 2”, <br />Tank #2-3: 2”, Tank #4: 6 1/2”, Tank #5: 4”. Tank #5 is the DEF tank. <br /> <br />Thanks <br /> <br />Latham <br /> <br />Get Outlook for iOS <br />From: Presto, Carol [EHD] <cpresto@sjgov.org> <br />Sent: Monday, November 25, 2024 1:46:04 PM <br />To: SeanMurphy <Sean@tccontractors.com>; GARY SANDHU <garybiz1@yahoo.com> <br />Cc: MiguelCeja <Miguel@tccontractors.com>; LathamZubillaga <Latham@tccontractors.com>; MarkFarmer <br /><Mark@tccontractors.com> <br />Subject: RE: Wilson Chevron-4343 Wilson Way Stockton-Approval to Receive Fuel <br /> <br />Good Morning Sean and Gary, <br /> <br />Please review pages 3 and 4 of approval letter dated June 19, 2023 to ensure all items have been completed/are in <br />compliance before final approval. <br /> <br />Paperwork wise (item 12), the following are missing: <br />1. TANK INSTALLATION CHECKLIST <br />Missing on checklist: <br />- PAGE 37 <br />o Nominal Tank Diameter for TANK #3 <br />o Record fluid level in reservoir for double-wall wet tanks for TANK #3 <br />- PAGE 38 <br />o If applicable, record monitoring fluid level when backfilling & top slab installation are complete for <br />TANK #1 (20k), TANK #2, TANK #3, TANK #4 <br />2. FACILITY EMPLOYEE TRAINING CERTIFICATE <br /> <br />Gary, as discussed on the phone today, please see attached invoice for outstanding service request fees as well as <br />calculation for the CUPA Operating Permit fees. Please note that the outstanding fees for the service request is only able <br />to be generated up to May 2024 as we switched systems and does not yet have the ability to generate past May 2024. <br />An additional invoice for remainder of the service request fees to follow eventually when Accounting is able to generate <br />newer invoices. The Operating Permit fees are attached via an Excel worksheet calculation (again since Accounting is <br />unable to generate new invoices). The Operating Permit fees is calculated from the attached UST Fee Sheet (section
The URL can be used to link to this page
Your browser does not support the video tag.