Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 6. SENSORTE TINC RESULTS <br /> List only sensors tested on date of this certification. List "Sensor ID"as labeled in system <br /> programming. Additional copies of this page may be attached to accommodate all sensors tested. <br /> ensar lD Sensor Made) Component(s) Monitored Pass Fail <br /> L1 794380-208 Bio An nu Ear <br /> L2 794380-208 Bio Fill Sump El 0 <br /> L3 794380-208 Bio Fill Hydro E C <br /> L4 794380-208 Bio TLM Sump E El <br /> L5 794380- 08 Bio TLM Hydro <br /> L8 794380-208 Bio Pipe Sump 97 <br /> L7 794380-303 Bio Pipe Hydro 97 <br /> L$ 794380-303 I3io Transition N Sump <br /> L9 794380-303 Bio Transition N Hydro <br /> L'IQ 7D4380-303 Bia Tansition S Sump 0 <br /> L11 794380-303 Bio Transition S Hydro Q <br /> L12 7 4380-303 I3io pent Sump � 0 <br /> L13 70480- 08 BIo Vent Hydro E El <br /> L14 794380-208 Bio dent Line Hydro r <br /> L15 794380-208 Bio Stied Sump <br /> L16 794380- 08 Bio Shed Hydra <br /> r ri <br /> s I 330020-4631330020-464 Elio Prod Vac E r <br /> s2 330020-4631330626-46d RV 19.20 prod P El <br /> s3 339020-463 r 3300Zp-464 21 0 Prod <br /> 0 � <br /> Describe all answers marked "No"or 'Fail"and proposed remedy in Section 9_ <br /> List all mooiforiog equipment either replaced or repairers in Sectfon 9 <br /> Page 3 of 6 <br />